Golden View Renovation Inc
- Based in
- San Jose
- On San Francisco permits
- Dec 2022 to Aug 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 4 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 1388 Gough St | minor revision to pa# 2025-0428-5357 changing sub-panel location and door to closet.Details
minor revision to pa# 2025-0428-5357 changing sub-panel location and door to closet. | |
| Sep 16, 2025 | In progress issued Mar 2026 | 1388 Gough St | unit 1108-revision 202504285357- like for like primary bathroom remodel. remove (e) non load bearing wall and frame (n) wall to extend shower. relocated subpanel within spaceDetails
unit 1108-revision 202504285357- like for like primary bathroom remodel. remove (e) non load bearing wall and frame (n) wall to extend shower. relocated subpanel within space | $25,000 |
| May 9, 2025 | In progress issued Jul 2025 | 1388 Gough St | master bathroom remodel with fixtures relocation and non-loading wall removal per plans. bathroom size 93 sq ftDetails
master bathroom remodel with fixtures relocation and non-loading wall removal per plans. bathroom size 93 sq ft | $25,000 |
| Aug 2, 2024 | Completed final sign-off Dec 2024 | 1556 Shrader St | g/f -add new partition wall in the family room to divide existing space into separate room (office) and media room.Details
g/f -add new partition wall in the family room to divide existing space into separate room (office) and media room. | $1,000 |
| Mar 21, 2024 | Completed final sign-off Feb 2025 | 1556 Shrader St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $19,000 |
| Feb 29, 2024 | Completed final sign-off Feb 2025 | 2171 Sacramento St | #12: in kind bathroom remodel. no windows change, no wall removed, replacing all fixtures in the same locations.Details
#12: in kind bathroom remodel. no windows change, no wall removed, replacing all fixtures in the same locations. | $12,000 |
| Dec 20, 2022 | Completed final sign-off Jun 2024 | 300 Beale St | #611: interior remodel per plans that includes kitchen and powder room remodeling, plus adding 20 led lights. reconfigure kitchen layout by removing (e) non bearing walls and building partition walls (n).Details
#611: interior remodel per plans that includes kitchen and powder room remodeling, plus adding 20 led lights. reconfigure kitchen layout by removing (e) non bearing walls and building partition walls (n). | $39,050 |