Back to bathroom remodel contractors
Golden State Construction And Remodel
- Based in
- San Jose
- On San Francisco permits
- Nov 2006 to Sep 2007
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2007 | Completed final sign-off Oct 2007 | 2682 43rd Av | remove & replace shower tile, shower faucet, shower pan, install recessed light over shower, gfci and sensor switch on 2/f bathroom.Details
remove & replace shower tile, shower faucet, shower pan, install recessed light over shower, gfci and sensor switch on 2/f bathroom. | $6,400 |
| Aug 20, 2007 | Expired or cancelled expired Sep 2008 | 25 Arleta Av | 1 bathroom remodel.Details
1 bathroom remodel. | $10,000 |
| May 25, 2007 | Completed final sign-off Oct 2007 | 615 Peralta Av | bathroom remodel change out old extg fixtures bathtub, vanity, toilet, fuacet, electrical lighting add florescent fan/light combo and gfi to meet current code. repairs to wood sub floor if required, new tile and paint. install 1 incondescent light over shower/tub & 1 florescent fan light reinstallDetails
bathroom remodel change out old extg fixtures bathtub, vanity, toilet, fuacet, electrical lighting add florescent fan/light combo and gfi to meet current code. repairs to wood sub floor if required, new tile and paint. install 1 incondescent light over shower/tub & 1 florescent fan light reinstall | $6,400 |
| Apr 6, 2007 | Never finaled issued Apr 2007, no final | 2555 Leavenworth St | 304: remove andr replace floor and wall tile around bathtub. remove and replace bath tub, reinstall existing toilet, reinstall existing or new sink and vanity, repair dryrot underneath bathtub, paint, remove and install ex vanity bar light fixture. 1 bath remodelDetails
304: remove andr replace floor and wall tile around bathtub. remove and replace bath tub, reinstall existing toilet, reinstall existing or new sink and vanity, repair dryrot underneath bathtub, paint, remove and install ex vanity bar light fixture. 1 bath remodel | $6,459 |
| Nov 10, 2006 | Completed final sign-off Jan 2008 | 2475 39th Av | frame new bathrm, storage on g/f, remodel kitchen and existing bath on 2nd fl.Details
frame new bathrm, storage on g/f, remodel kitchen and existing bath on 2nd fl. | $75,000 |