Back to bathroom remodel contractors
Golden State Builders
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Mar 2007
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2007 | Completed final sign-off May 2007 | 775 Vermont St | bathroom remodel-rough & finish plumbing & electric, install tile & sink washer/dryer installation-run plumbing-rough & finish & gas. seismic voluntary bolting on foundation sill, 5/8 bolt ever 4' min 7' embedment.Details
bathroom remodel-rough & finish plumbing & electric, install tile & sink washer/dryer installation-run plumbing-rough & finish & gas. seismic voluntary bolting on foundation sill, 5/8 bolt ever 4' min 7' embedment. | $15,000 |
| Jun 30, 2006 | Completed final sign-off Nov 2006 | 1439 37th Av | kitchen remodel: new drywall, insulation,cabinets,coutertop,tile floors,replace 2 windows,electrical,plumbing upgrades. bath remodel:new drywall,insulation,tub,toilet,vanity,shower stall,tile floor,upgrade electrical & plumbing,replace skylight & window. new water heater, new furnance & painting.Details
kitchen remodel: new drywall, insulation,cabinets,coutertop,tile floors,replace 2 windows,electrical,plumbing upgrades. bath remodel:new drywall,insulation,tub,toilet,vanity,shower stall,tile floor,upgrade electrical & plumbing,replace skylight & window. new water heater, new furnance & painting. | $60,000 |
| Feb 10, 2006 | Completed final sign-off Jan 2007 | 730 32nd Av | remodel kitchen, 2 baths, upgrade electrical and plumbing.Details
remodel kitchen, 2 baths, upgrade electrical and plumbing. | $60,000 |
| Aug 17, 2005 | Completed final sign-off Nov 2005 | 547 19th Av | kitchen and bath remodelDetails
kitchen and bath remodel | $30,000 |