Permit GraphShortlistSan Francisco building permits since 2000

Golden Coast Enterprise

Contractor license
1031895
State license record
Based in
San Francisco
On San Francisco permits
Feb 2018 to Jan 2020
Last 24 months
0 permits filed

3 permits since 2000: 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllBathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 62 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 22, 2020Completed
final sign-off Mar 2020
158 Hamerton Avremodel (e) residential master bathroom, replace 1 bathroom window in kind, located back exterior wall of house, replace (e) toilet and vanity at same location reconfigure standing shower walls with in bathroom, new vanity and ceilng, lights outlets and switches
Details
Permit
202001222452
Status
complete
Filed
Jan 22, 2020
Permit issued
Jan 22, 2020
Final sign-off
Mar 24, 2020
Declared cost
$28,500
Address
158 Hamerton Av

remodel (e) residential master bathroom, replace 1 bathroom window in kind, located back exterior wall of house, replace (e) toilet and vanity at same location reconfigure standing shower walls with in bathroom, new vanity and ceilng, lights outlets and switches

Open the permit page

$28,500
Feb 28, 2018Completed
final sign-off Apr 2018
1890 30th Avbathroom remodel - replacing shower tile (only). sheetrock and cement board replaced as well. plumbing fixtures (existing) to remain. touch up paint.
Details
Permit
201802282444
Status
complete
Filed
Feb 28, 2018
Permit issued
Feb 28, 2018
Final sign-off
Apr 30, 2018
Declared cost
$7,500
Address
1890 30th Av

bathroom remodel - replacing shower tile (only). sheetrock and cement board replaced as well. plumbing fixtures (existing) to remain. touch up paint.

Open the permit page

$7,500