Back to bathroom remodel contractors
Godoy Inc
- Based in
- Moss Beach
- On San Francisco permits
- Jun 2013 to Jun 2021
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2021 | Completed final sign-off Jan 2023 | 152 Everson St | repairing deck and stairs (less than 50%). one in kind bathroom remodel, non structural.Details
repairing deck and stairs (less than 50%). one in kind bathroom remodel, non structural. | $20,000 |
| Feb 5, 2021 | Completed final sign-off Jan 2023 | 152 Everson St | general construction permit: ductless hvac system kitchen remodel. (changing floor plans/walls) bathroom remodel (changing floor plans/walls) residential remodel interior(changing floor plans/walls) remove curb cut and restore full curb - remove parking add bike parkingDetails
general construction permit: ductless hvac system kitchen remodel. (changing floor plans/walls) bathroom remodel (changing floor plans/walls) residential remodel interior(changing floor plans/walls) remove curb cut and restore full curb - remove parking add bike parking | $60,000 |
| Jun 20, 2017 | Completed final sign-off Sep 2017 | 3219 Moraga St | bathroom remodel. all other fixts & finishes to be replaced in-like & kind. no structural work.Details
bathroom remodel. all other fixts & finishes to be replaced in-like & kind. no structural work. | $15,000 |
| Jun 13, 2013 | Completed final sign-off Jul 2013 | 1626 Vallejo St | #2 - kitchen remove tile floor and install new tile. tile back splash, approx 8'x12. bathroom: remove existing tile replace with new tile. leave existing tub, demo old stove and sink, replace new hood. replace with new plainess, replace in kind. the same location.Details
#2 - kitchen remove tile floor and install new tile. tile back splash, approx 8'x12. bathroom: remove existing tile replace with new tile. leave existing tub, demo old stove and sink, replace new hood. replace with new plainess, replace in kind. the same location. | $6,000 |