Back to bathroom remodel contractors
Gm Plumbing Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Sep 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2010 | Completed final sign-off Nov 2010 | 41 Parsons St | partition partion of existing walk-in closet & install private access master bathroom adjacent to exisitng master bedroom. install new plumbing fixtures, alter electrical & install new ventilation exhaust fan.Details
partition partion of existing walk-in closet & install private access master bathroom adjacent to exisitng master bedroom. install new plumbing fixtures, alter electrical & install new ventilation exhaust fan. | $7,300 |
| Jul 24, 2008 | Expired or cancelled withdrawn Aug 2008 | 2316 Golden Gate Av | refurbishment of the bathroom in each of the two units. replace water closet, lavatory & shower. bath tub to remain. new exhaust fan. upgrate electrical lighting and outlets. replace water piping with copper tubing. repalce portion ceiling, wall and floor. paint throughout.Details
refurbishment of the bathroom in each of the two units. replace water closet, lavatory & shower. bath tub to remain. new exhaust fan. upgrate electrical lighting and outlets. replace water piping with copper tubing. repalce portion ceiling, wall and floor. paint throughout. | $10,000 |
| Sep 20, 2007 | Completed final sign-off Feb 2008 | 1200 Gough St | remodel two (e) bathroom. replace plumbing fixtures in same location. add cloth washer/dryer, add light fixtures, ground fault electrical outlets, patch, paint & new tile work. provide fluorescent light or occupancy sensors in bathroom.Details
remodel two (e) bathroom. replace plumbing fixtures in same location. add cloth washer/dryer, add light fixtures, ground fault electrical outlets, patch, paint & new tile work. provide fluorescent light or occupancy sensors in bathroom. | $9,000 |