Gloss Home Inc
- Based in
- San Jose
- On San Francisco permits
- Mar 2026 to Sep 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2026 | In progress issued Sep 2026 | 615 20th Av | 2 bathrooms: bath tub to walk-in shower conversion, tiling, new vanities, new toilets, no relocation, new medicine cabinets, replacment fans, heaterh, switchesDetails
2 bathrooms: bath tub to walk-in shower conversion, tiling, new vanities, new toilets, no relocation, new medicine cabinets, replacment fans, heaterh, switches | $36,500 |
| Aug 21, 2026 | In progress issued Aug 2026 | 850 Powell St | #601 -bathroom remodel: tub and shower pan convention, new shower system, new tile floor, walls, new vanity, lights, shower wall, new toilet, custom storage glass doorDetails
#601 -bathroom remodel: tub and shower pan convention, new shower system, new tile floor, walls, new vanity, lights, shower wall, new toilet, custom storage glass door | $34,000 |
| Apr 14, 2026 | Completed final sign-off May 2026 | 1901 California St | unit #8: addition of pre-existing wall and room door on western portion of living room, to including new lighting, closet, and removal and reinstallation of existing steam radiator, paint all areas and repair floor as needed.Details
unit #8: addition of pre-existing wall and room door on western portion of living room, to including new lighting, closet, and removal and reinstallation of existing steam radiator, paint all areas and repair floor as needed. | $19,100 |
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 166 Palm Av | unit 4: bathroom renovation: new toilet installation with relocation of drain; fan installation with duct line on exterior wall; replacing wall and floor tile; new vanity installation; bathroom rewiring: adding a fan switch, new vanity light. exhaust terminate per cmc 502.2.1.Details
unit 4: bathroom renovation: new toilet installation with relocation of drain; fan installation with duct line on exterior wall; replacing wall and floor tile; new vanity installation; bathroom rewiring: adding a fan switch, new vanity light. exhaust terminate per cmc 502.2.1. | $22,000 |
| Mar 2, 2026 | Completed final sign-off Mar 2026 | 3678 Fillmore St | common stairs: replacing damaged rear exterior staircase parts: replacing stringer, one post, 8 treads and risers, section of handrail with wooden balusters. all work is in-kind. less than 50%.Details
common stairs: replacing damaged rear exterior staircase parts: replacing stringer, one post, 8 treads and risers, section of handrail with wooden balusters. all work is in-kind. less than 50%. | $5,000 |