Back to bathroom remodel contractors
Gilley Construction & Restoration Inc
- Based in
- Lodi
- On San Francisco permits
- Mar 2026 to Mar 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 in progress. Typically 1 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2026 | In progress issued Mar 2026 | 248 Dalewood Wy | in kind replacement of non street facing 10 windows and 1 sliding door in (e) openings. 2 windows to change from operable to fixed for safety. remodel 2 1/2 bathrooms in kind, like for like. replace 3 ext. and 16 int. lights with (n) fixtures in (e) locations. r/r switches and outlets in (e) loc.Details
in kind replacement of non street facing 10 windows and 1 sliding door in (e) openings. 2 windows to change from operable to fixed for safety. remodel 2 1/2 bathrooms in kind, like for like. replace 3 ext. and 16 int. lights with (n) fixtures in (e) locations. r/r switches and outlets in (e) loc. | $75,000 |