Permit GraphShortlistSan Francisco building permits since 2000

Gill Construction

Contractor license
582513
State license record
Based in
San Francisco
On San Francisco permits
Apr 2002 to Dec 2025
Last 24 months
2 permits filed

37 permits since 2000: 32 completed, 2 never finaled, 3 expired or cancelled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 2Pergola or trellis 1Deck 7Stairs 6Kitchen remodel 9Bathroom remodel 13

13 bathroom remodel permits: 13 completed. Typically 70 days from filing to permit and 264 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 1, 2025Completed
final sign-off Feb 2026
68 Whitney Stin kind master bathroom remodel, upper flr, replace tiles, replace glass shower enclosure, vanity, medicine cabinet, faucet, toilet, lights. no change in layout, all like for like.
Details
Permit
202512010603
Status
complete
Filed
Dec 1, 2025
Permit issued
Dec 5, 2025
Final sign-off
Feb 24, 2026
Declared cost
$35,000
Address
68 Whitney St

in kind master bathroom remodel, upper flr, replace tiles, replace glass shower enclosure, vanity, medicine cabinet, faucet, toilet, lights. no change in layout, all like for like.

Open the permit page

$35,000
Jun 25, 2021Completed
final sign-off Mar 2022
39 Rosewood Drinterior remodel including family room, 2nd fl powder room, erd fl bath, no struc changes. remodel kitchen and widen doorway between kitchen and dining room
Details
Permit
202106253242
Status
complete
Filed
Jun 25, 2021
Permit issued
Jun 25, 2021
Final sign-off
Mar 16, 2022
Declared cost
$114,235
Address
39 Rosewood Dr

interior remodel including family room, 2nd fl powder room, erd fl bath, no struc changes. remodel kitchen and widen doorway between kitchen and dining room

Open the permit page

$114,235
Jan 8, 2021Completed
final sign-off Mar 2022
64 Brentwood Avremodel of single family residence to include remodel of (e) stair, kitchen & guest bath. (n) plumbing, electrical, windows, doors, and interior finishes in area of remodel.
Details
Permit
202101082391
Status
complete
Filed
Jan 8, 2021
Permit issued
Mar 19, 2021
Final sign-off
Mar 8, 2022
Declared cost
$105,000
Address
64 Brentwood Av

remodel of single family residence to include remodel of (e) stair, kitchen & guest bath. (n) plumbing, electrical, windows, doors, and interior finishes in area of remodel.

Open the permit page

$105,000
Dec 7, 2020Completed
final sign-off Sep 2021
90 Norwich St(n) finishes and/or fixtures in liv-sleep-kitch-bath rms & closet. install replace 1 (n) window & 2 (n) doors at rear facade-not visible from street. (n) laundry, 2 furnaces, 1 instant water heater. 2 rated doors separating living spaces from garage.
Details
Permit
202012070384
Status
complete
Filed
Dec 7, 2020
Permit issued
Mar 2, 2021
Final sign-off
Sep 8, 2021
Declared cost
$72,000
Address
90 Norwich St

(n) finishes and/or fixtures in liv-sleep-kitch-bath rms & closet. install replace 1 (n) window & 2 (n) doors at rear facade-not visible from street. (n) laundry, 2 furnaces, 1 instant water heater. 2 rated doors separating living spaces from garage.

Open the permit page

$72,000
Sep 26, 2020Completed
final sign-off Apr 2024
919 Sanchez Stvertical 3rd story addition. excavatopm >50 cu yd, renovate (e) 2nd level, add (3) bedrms & (2) baths @ (n) 3rd level. no work to (e) front historic facade & front yard. minor rear yard deck alteration w/ (n) sunken hot tub. continue tradesman path to rear yard
Details
Permit
202009265055
Status
complete
Filed
Sep 26, 2020
Permit issued
Sep 10, 2021
Final sign-off
Apr 10, 2024
Declared cost
$275,000
Address
919 Sanchez St

vertical 3rd story addition. excavatopm >50 cu yd, renovate (e) 2nd level, add (3) bedrms & (2) baths @ (n) 3rd level. no work to (e) front historic facade & front yard. minor rear yard deck alteration w/ (n) sunken hot tub. continue tradesman path to rear yard

Open the permit page

$275,000
Dec 6, 2019Completed
final sign-off Aug 2020
112 Chenery Stenclose lightwell (approx 46 sf) to add a new interior stair from 1st to 2nd fl. remodel @ 2nd fl include kitchen, bathroom & new powder room, window replacement, a new skylight & 2 new solatubes.
Details
Permit
201912068842
Status
complete
Filed
Dec 6, 2019
Permit issued
Dec 10, 2019
Final sign-off
Aug 12, 2020
Declared cost
$110,604
Address
112 Chenery St

enclose lightwell (approx 46 sf) to add a new interior stair from 1st to 2nd fl. remodel @ 2nd fl include kitchen, bathroom & new powder room, window replacement, a new skylight & 2 new solatubes.

Open the permit page

$110,604
May 31, 2019Completed
final sign-off Mar 2020
2647 Pierce St3rd floor: 2 small infill additions, remodel one full bath add one full bath. new dormer at front and windows at rear. new fire escape balcony at rear and stairs. at roof: roof as required for 3rd floor work. revision to app#201507242404 issued 12/28/17
Details
Permit
201905312157
Status
complete
Filed
May 31, 2019
Permit issued
Jun 21, 2019
Final sign-off
Mar 13, 2020
Address
2647 Pierce St

3rd floor: 2 small infill additions, remodel one full bath add one full bath. new dormer at front and windows at rear. new fire escape balcony at rear and stairs. at roof: roof as required for 3rd floor work. revision to app#201507242404 issued 12/28/17

Open the permit page

Mar 27, 2019Completed
final sign-off Mar 2021
1879 Church St(n) vertical addition of roof deck, guardrails, stair penthouse, (2)(n) skylights, (n) rear windows & doors, (n) spiral staircase & interior remodel of (e) kitchen, bath & den
Details
Permit
201903276393
Status
complete
Filed
Mar 27, 2019
Permit issued
Oct 8, 2019
Final sign-off
Mar 10, 2021
Declared cost
$240,000
Address
1879 Church St

(n) vertical addition of roof deck, guardrails, stair penthouse, (2)(n) skylights, (n) rear windows & doors, (n) spiral staircase & interior remodel of (e) kitchen, bath & den

Open the permit page

$240,000
Oct 24, 2016Completed
final sign-off Feb 2017
3130 Gough Stremove tile in shower and bathroom floor and replace shower pan due to leaks and re-tile.
Details
Permit
201610241022
Status
complete
Filed
Oct 24, 2016
Permit issued
Oct 24, 2016
Final sign-off
Feb 6, 2017
Declared cost
$2,000
Address
3130 Gough St

remove tile in shower and bathroom floor and replace shower pan due to leaks and re-tile.

Open the permit page

$2,000
May 31, 2016Completed
final sign-off Sep 2017
140 Pacheco St1st flr: expand conditioned space into garage. create new bedroom suite. select window & door replacements. 2nd flr: kitchen & bathroom renovations with window replacements
Details
Permit
201605318718
Status
complete
Filed
May 31, 2016
Permit issued
Sep 16, 2016
Final sign-off
Sep 19, 2017
Declared cost
$75,000
Address
140 Pacheco St

1st flr: expand conditioned space into garage. create new bedroom suite. select window & door replacements. 2nd flr: kitchen & bathroom renovations with window replacements

Open the permit page

$75,000
Apr 18, 2016Completed
final sign-off Jan 2020
80 Norwich Stcomplete renovation to (e) residence. raise structure 12" & excavate down 18" (approx). provide (n) 2-bedroom, 2-bath, 1-kitchen, living & dining. (n) 2-story rear yard addition w/ small roof deck.
Details
Permit
201604185042
Status
complete
Filed
Apr 18, 2016
Permit issued
May 10, 2017
Final sign-off
Jan 13, 2020
Declared cost
$325,800
Address
80 Norwich St

complete renovation to (e) residence. raise structure 12" & excavate down 18" (approx). provide (n) 2-bedroom, 2-bath, 1-kitchen, living & dining. (n) 2-story rear yard addition w/ small roof deck.

Open the permit page

$325,800
Apr 24, 2015Completed
final sign-off Dec 2015
103 Wool Stshower addition to existing basement bathroom.
Details
Permit
201504244543
Status
complete
Filed
Apr 24, 2015
Permit issued
Jul 10, 2015
Final sign-off
Dec 14, 2015
Declared cost
$10,000
Address
103 Wool St

shower addition to existing basement bathroom.

Open the permit page

$10,000
Dec 5, 2014Completed
final sign-off Jun 2015
354 Arlington Stremodel kitchen & bathroom (same location). no alteration of wall, window and door.
Details
Permit
201412053141
Status
complete
Filed
Dec 5, 2014
Permit issued
Dec 5, 2014
Final sign-off
Jun 26, 2015
Declared cost
$25,000
Address
354 Arlington St

remodel kitchen & bathroom (same location). no alteration of wall, window and door.

Open the permit page

$25,000