Gibbs Heating & Air Conditioning
- Based in
- San Rafael
- On San Francisco permits
- Apr 2007 to Sep 2007
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2007 | Never finaled issued Sep 2007, no final | 365 Vermont St | remove and replace 3 extg roof top a/c units in kind. #1 unit 10 ton #2 unit 7 1.2 ton , #3 unit 5 ton, all three units 92% efficient and 13 seerDetails
remove and replace 3 extg roof top a/c units in kind. #1 unit 10 ton #2 unit 7 1.2 ton , #3 unit 5 ton, all three units 92% efficient and 13 seer | $49,500 |
| Sep 14, 2007 | Completed final sign-off Sep 2007 | 1978 Greenwich St | remove old heating system & install new 92% efficient heator & new duct work. efficiency 92% . at same location in garage.Details
remove old heating system & install new 92% efficient heator & new duct work. efficiency 92% . at same location in garage. | $9,368 |
| Apr 27, 2007 | Completed final sign-off Oct 2007 | 201 Potrero Av | a hvac duct work installation of heat pumps suites 100, 420,410,401,405 mep onlyDetails
a hvac duct work installation of heat pumps suites 100, 420,410,401,405 mep only | $15,000 |