Back to bathroom remodel contractors
Gi Rednic Construction
- Based in
- Concord
- On San Francisco permits
- Jan 2008 to Feb 2008
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 29 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2008 | Completed final sign-off Feb 2008 | 282 19th Av | windows ( bathroom) non visible from street, no structural. replace (e) window w/ smaller window w/in (e) framing. revision to appl. # 2008/01/22/3015.Details
windows ( bathroom) non visible from street, no structural. replace (e) window w/ smaller window w/in (e) framing. revision to appl. # 2008/01/22/3015. | $250 |
| Jan 22, 2008 | Completed final sign-off Feb 2008 | 282 19th Av | work @ unit# 284 (lower unit) only. remodel bathroom. replace fixtures, surfaces.Details
work @ unit# 284 (lower unit) only. remodel bathroom. replace fixtures, surfaces. | $6,000 |