Back to bathroom remodel contractors
Gh Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2023 to Jul 2026
- Last 24 months
- 17 permits filed
18 permits since 2000: 9 completed, 8 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
10 bathroom remodel permits: 4 completed, 5 in progress, 1 expired or cancelled. Typically 6 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress issued Jul 2026 | 751 08th Av | remodel one bath(60 sqft, replace shower pan), 112 sf kitchen (replace cabinets and sink), laundry. replace 7 windows (5 front and 2 rear, u factor=0.3)Details
remodel one bath(60 sqft, replace shower pan), 112 sf kitchen (replace cabinets and sink), laundry. replace 7 windows (5 front and 2 rear, u factor=0.3) | $30,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 488 Corbett Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,500 |
| Jul 9, 2026 | In progress issued Aug 2026 | 306 Gambier St | g/f development: propose 1 family room, 1 bedroom, 1 media room, & full bath. tankless water heater & furnace.Details
g/f development: propose 1 family room, 1 bedroom, 1 media room, & full bath. tankless water heater & furnace. | $70,000 |
| Jun 29, 2026 | In progress issued Sep 2026 | 1835 18th Av | 1/f: add 1 bedroom and 1.5 bath; office horizontal addition at rear. 2/f: remodel kitchen and bath,add 1 bath, interior stairs and deck at rear. replace window at front with existing openingDetails
1/f: add 1 bedroom and 1.5 bath; office horizontal addition at rear. 2/f: remodel kitchen and bath,add 1 bath, interior stairs and deck at rear. replace window at front with existing opening | $220,000 |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 21 Carr St | revision of pa# 202602256517, to comply with nov #202650541 (item #3) - in kind remodel of (2) bathrooms. no change to (e) layout.Details
revision of pa# 202602256517, to comply with nov #202650541 (item #3) - in kind remodel of (2) bathrooms. no change to (e) layout. | $24,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 931 Edinburgh St | revision to pa #2025-0630-9852: lower (e) ground slab about 1ft. new foundation and slab. add new skylights to bathrooms.Details
revision to pa #2025-0630-9852: lower (e) ground slab about 1ft. new foundation and slab. add new skylights to bathrooms. | $10,000 |
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 21 Carr St | to comply with nov #202650541: remove & replace all ceiling & wall finishes due to severe mold contamination at both bathrooms approx 200 sq ft. repair water damaged drywall in the kitchen approx 30 sq ft. remove exterior siding to hardie cement siding approx 550 sq ft.Details
to comply with nov #202650541: remove & replace all ceiling & wall finishes due to severe mold contamination at both bathrooms approx 200 sq ft. repair water damaged drywall in the kitchen approx 30 sq ft. remove exterior siding to hardie cement siding approx 550 sq ft. | $20,000 |
| Nov 18, 2025 | Completed final sign-off Sep 2026 | 2737 22nd St | revision to permit 202509024375 (ref. 202504094023). reconfigure 4 fixtures bathroom layout on 3/f.Details
revision to permit 202509024375 (ref. 202504094023). reconfigure 4 fixtures bathroom layout on 3/f. | |
| Sep 23, 2025 | Completed final sign-off Mar 2026 | 633 Santiago St | 1st floor add 1 bath. bedroom and media room.Details
1st floor add 1 bath. bedroom and media room. | $115,000 |
| Apr 9, 2025 | Expired or cancelled expired Sep 2026 | 2737 22nd St | relocate (e) kitchen, remodel bathroom. volunteer upgrade (e) ceiling joists & relocate (e) sheetrock w/ new in dining room at 2/f. construct closet at 3/f.Details
relocate (e) kitchen, remodel bathroom. volunteer upgrade (e) ceiling joists & relocate (e) sheetrock w/ new in dining room at 2/f. construct closet at 3/f. | $68,000 |