Ggd Inc.
- Based in
- Sausalito
- On San Francisco permits
- Apr 2008 to Aug 2026
- Last 24 months
- 18 permits filed
193 permits since 2000: 134 completed, 17 in progress, 28 never finaled, 14 expired or cancelled.
Of the 28 never-finaled permits, 3 are 3 to 5 years old, 16 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
10 roof deck permits: 7 completed, 2 in progress, 1 never finaled. Typically 56 days from filing to permit and 448 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2025 | In progress issued Oct 2025 | 2765 Vallejo St | construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352Details
construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352 | $32,525 |
| Feb 7, 2025 | In progress issued Feb 2025 | 30 Presidio Tr | voluntary replacement in kind of existing dryrotted roof deck guard railing with new structural steel reinforced guard railing with exterior cladding to match existing exactly.Details
voluntary replacement in kind of existing dryrotted roof deck guard railing with new structural steel reinforced guard railing with exterior cladding to match existing exactly. | $20,000 |
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 3540 Jackson St | renovate all floors. addition of 1 bathroom, addition of 1 stair up to new roof deck. addition of nfpa13r sprinklers throughout the whole bld under sep permit. fenestration changes at rear and sides. no work visible from street. (n) retractable skylight. maher naDetails
renovate all floors. addition of 1 bathroom, addition of 1 stair up to new roof deck. addition of nfpa13r sprinklers throughout the whole bld under sep permit. fenestration changes at rear and sides. no work visible from street. (n) retractable skylight. maher na | $900,000 |
| Oct 11, 2016 | Completed final sign-off May 2022 | 2865 Vallejo St | vertical & horizontal addition. renovation of existing master bathroom & construct a new penthouse with new rear balcony and new front roof deck. as well as a new bath at penthouse level. **maher n/a**Details
vertical & horizontal addition. renovation of existing master bathroom & construct a new penthouse with new rear balcony and new front roof deck. as well as a new bath at penthouse level. **maher n/a** | $135,000 |
| Mar 7, 2016 | Completed final sign-off May 2016 | 2434 Broadway | 1)convert extg unoccupied lower roof area to occupied roof deck allowed under 2013 cole. 2) document stair #6 to as built config. (opposite from permitted) n/a for maherDetails
1)convert extg unoccupied lower roof area to occupied roof deck allowed under 2013 cole. 2) document stair #6 to as built config. (opposite from permitted) n/a for maher | |
| Apr 8, 2014 | Completed final sign-off Aug 2016 | 2570 Jackson St | replace (e) windscreen @ south roof deck. replace (e) windscreen @ north west patio. add new balcony & spiral stair to rear yard. ** maher: compliance with ordinance no# 155-13 not required **Details
replace (e) windscreen @ south roof deck. replace (e) windscreen @ north west patio. add new balcony & spiral stair to rear yard. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 |
| Feb 7, 2014 | Completed final sign-off Dec 2015 | 2434 Broadway | modify (e) approved permit app#201206061976 toinclude: new elevator penthouse to new occupied lower roof deck, below solar array roof. solar array roof (not occupied) to be increase in height by 1'-3". add 1 new skylight (flat) to lower roof deck & add 2 new skylights (flat) to front (e) roof.Details
modify (e) approved permit app#201206061976 toinclude: new elevator penthouse to new occupied lower roof deck, below solar array roof. solar array roof (not occupied) to be increase in height by 1'-3". add 1 new skylight (flat) to lower roof deck & add 2 new skylights (flat) to front (e) roof. | $30,000 |
| Apr 26, 2011 | Completed final sign-off Dec 2011 | 2440 Broadway | addition of a roof deck and exterior stair to the upper unit of existing 4 story, 3 unit residential building. renovation of existing mep system to be design build. e fire sprinkler system installed by previous owner. modifications to e fire sprinler system to be design buildDetails
addition of a roof deck and exterior stair to the upper unit of existing 4 story, 3 unit residential building. renovation of existing mep system to be design build. e fire sprinkler system installed by previous owner. modifications to e fire sprinler system to be design build | $40,000 |
| Oct 19, 2010 | Completed final sign-off Oct 2011 | 2709 Larkin St | remodeling existing roof over existing garage at rear to enlarge (e) roof deck at 1st floor.Details
remodeling existing roof over existing garage at rear to enlarge (e) roof deck at 1st floor. | $10,100 |
| Dec 30, 2009 | Completed final sign-off Apr 2011 | 3098 Pacific Av | int. remodel on flrs. incl.: infill of (e) lightwell @ east 2nd. & 3rd. stories to below adj. window. replace all windows & doors w/(n) wd. insul. units to match (e). 1st. flr. excavate (e) crawl space incl. (n) fnd./no increase in envelope. 2nd. flr.:int. remodel; (n) sidelights @ roof deck o/ g...Details
int. remodel on flrs. incl.: infill of (e) lightwell @ east 2nd. & 3rd. stories to below adj. window. replace all windows & doors w/(n) wd. insul. units to match (e). 1st. flr. excavate (e) crawl space incl. (n) fnd./no increase in envelope. 2nd. flr.:int. remodel; (n) sidelights @ roof deck o/ g... | $287,000 |