Back to bathroom remodel contractors
Gericke Construction
- Based in
- Sausalito
- On San Francisco permits
- Oct 2005 to Aug 2007
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 232 days from filing to permit and 393 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2006 | Expired or cancelled expired Aug 2009 | 2666 Vallejo St | new garage (with some excavation) in existing basement. new driveway and curb cut. demo existing (1 story) bathroom in rear, replace with 2 story stack (breakfast room over mudroom). also remodeling at interior: bathrooms and third floor. no horizontalDetails
new garage (with some excavation) in existing basement. new driveway and curb cut. demo existing (1 story) bathroom in rear, replace with 2 story stack (breakfast room over mudroom). also remodeling at interior: bathrooms and third floor. no horizontal | $190,000 |
| Oct 18, 2005 | Completed final sign-off Nov 2006 | 3662 Clay St | all work to be within the (e) buld envelope. no change to bldg footprint. master bath to be completely remodeled and kitchen to be partially remodeled. remove masonry fireplace @ second fl & masonry chimney @ 3rd/fl. replace w/new double walled flue. move non bearing partition in mudroom. no structDetails
all work to be within the (e) buld envelope. no change to bldg footprint. master bath to be completely remodeled and kitchen to be partially remodeled. remove masonry fireplace @ second fl & masonry chimney @ 3rd/fl. replace w/new double walled flue. move non bearing partition in mudroom. no struct | $65,000 |