Back to bathroom remodel contractors
Gerard Keightley Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Oct 2019
- Last 24 months
- 0 permits filed
31 permits since 2000: 27 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2019 | Completed final sign-off May 2020 | 1247 35th Av | remodel 1-1/2 bathrooms. new fixtures, tile, electrical, and plumbing, new drywall/sheetrock.Details
remodel 1-1/2 bathrooms. new fixtures, tile, electrical, and plumbing, new drywall/sheetrock. | $15,000 |
| Nov 30, 2016 | Completed final sign-off Apr 2017 | 1710 21st Av | 1/2 bath remodel. new plumbing & new electrical. new fixtures, new tile, new drywall. repair cracked stucco and repair dryrot on front corners in front, in kind.Details
1/2 bath remodel. new plumbing & new electrical. new fixtures, new tile, new drywall. repair cracked stucco and repair dryrot on front corners in front, in kind. | $25,000 |
| Feb 27, 2015 | Never finaled issued Feb 2015, no final | 35 El Verano Wy | bath remodel. new plumbing fixtures, new sheetrock and tile. like for like.Details
bath remodel. new plumbing fixtures, new sheetrock and tile. like for like. | $15,000 |
| Jan 14, 2015 | Completed final sign-off Jun 2015 | 847 25th Av | bath remodel; to comply with cec150.0(k)5Details
bath remodel; to comply with cec150.0(k)5 | $5,000 |
| Dec 22, 2014 | Completed final sign-off Sep 2015 | 2671 37th Av | kitchen remodel new cabinets counter top. (1) bathroom replace fixtures and tile. repair/replace windows. front 2 rear of house in kind. repair dryrot and stucco font of house. install bolts in mudsill in ext walls. replace street facing windows in kind with wood casement windows.Details
kitchen remodel new cabinets counter top. (1) bathroom replace fixtures and tile. repair/replace windows. front 2 rear of house in kind. repair dryrot and stucco font of house. install bolts in mudsill in ext walls. replace street facing windows in kind with wood casement windows. | $15,000 |
| Nov 21, 2014 | Completed final sign-off Sep 2015 | 2027 Moraga St | replace cabinets & plumbing fixtures, coutner tops in kitchen. new tile in shower, fixtures in bathroom, repair siding & windows in rear. install anchor bolts at garage level, repair stairs to garage, less than 50% u factor max 0.32. bolts 3'6" voluntary.Details
replace cabinets & plumbing fixtures, coutner tops in kitchen. new tile in shower, fixtures in bathroom, repair siding & windows in rear. install anchor bolts at garage level, repair stairs to garage, less than 50% u factor max 0.32. bolts 3'6" voluntary. | $15,000 |
| Jul 21, 2014 | Completed final sign-off Jun 2015 | 847 25th Av | kitchen remodel, new counter top, replace 2 windows in kitchen facing lightwell in kind, u factor .32; laundry room, bath shower, new pan, new lights in ceiling install 2 cabinets in dining; to comply lwiht cec150(k) 8 & 10, remove door between kitchen & dining room - leave open, replace plumbingDetails
kitchen remodel, new counter top, replace 2 windows in kitchen facing lightwell in kind, u factor .32; laundry room, bath shower, new pan, new lights in ceiling install 2 cabinets in dining; to comply lwiht cec150(k) 8 & 10, remove door between kitchen & dining room - leave open, replace plumbing | $15,000 |
| Dec 6, 2010 | Completed final sign-off May 2011 | 2471 25th Av | ground floor - existing den, family room & bathroom to be legalized. reconfigure existing interior stair to access existing conditioned space. provide new 20 min. door between garage & stair.Details
ground floor - existing den, family room & bathroom to be legalized. reconfigure existing interior stair to access existing conditioned space. provide new 20 min. door between garage & stair. | $8,500 |
| May 10, 2006 | Completed final sign-off Mar 2007 | 454 Scott St | interior remodel including structural upgrade.relocate partitions. interior stair to garage from lower unit. remove exterior mineral siding. all new wood windows. repair /replace facade trim & mouldings. minor 20 sf. "fill in" at rear (lower unit). (foundations & kitchens/baths under separ permits.Details
interior remodel including structural upgrade.relocate partitions. interior stair to garage from lower unit. remove exterior mineral siding. all new wood windows. repair /replace facade trim & mouldings. minor 20 sf. "fill in" at rear (lower unit). (foundations & kitchens/baths under separ permits. | $100,000 |
| Mar 31, 2006 | Completed final sign-off Apr 2007 | 454 Scott St | remodel 2 kitchens one kitchen on each unit no change to partitions on walls or windows 5 baths (two at unit 456 and 3 at unit 454)Details
remodel 2 kitchens one kitchen on each unit no change to partitions on walls or windows 5 baths (two at unit 456 and 3 at unit 454) | $65,000 |
| Jun 15, 2004 | Expired or cancelled expired Jul 2006 | 210 Magellan Av | non-structural only- remodel kitchen & bathrooms -two and a half-replace/repair existing cracked latDetails
non-structural only- remodel kitchen & bathrooms -two and a half-replace/repair existing cracked lat | $120,000 |