Permit GraphShortlistSan Francisco building permits since 2000

George Somers Construction

Contractor license
929690
State license record
Based in
Redding
On San Francisco permits
Mar 2011 to Feb 2013
Last 24 months
0 permits filed

10 permits since 2000: 10 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllBathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 18 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 27, 2011Completed
final sign-off May 2011
112 07th Strevision to pa# 2011.03.21.2522. new ceiling and elec. fixtures at existing dining and existing corridor. no cahne to (e0 bathrooms. ne whandrail at each side of (e) ramp ( interior)
Details
Permit
201104274928
Status
complete
Filed
Apr 27, 2011
Permit issued
Apr 28, 2011
Final sign-off
May 16, 2011
Address
112 07th St

revision to pa# 2011.03.21.2522. new ceiling and elec. fixtures at existing dining and existing corridor. no cahne to (e0 bathrooms. ne whandrail at each side of (e) ramp ( interior)

Open the permit page