Back to bathroom remodel contractors
George Somers Construction
- Based in
- Redding
- On San Francisco permits
- Mar 2011 to Feb 2013
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 18 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2011 | Completed final sign-off May 2011 | 112 07th St | revision to pa# 2011.03.21.2522. new ceiling and elec. fixtures at existing dining and existing corridor. no cahne to (e0 bathrooms. ne whandrail at each side of (e) ramp ( interior)Details
revision to pa# 2011.03.21.2522. new ceiling and elec. fixtures at existing dining and existing corridor. no cahne to (e0 bathrooms. ne whandrail at each side of (e) ramp ( interior) |