Back to bathroom remodel contractors
George Julian Bldg Const
- Based in
- San Jose
- On San Francisco permits
- Sep 2015 to Jul 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2025 | Completed final sign-off Jul 2025 | 2040 Franklin St | in-kind remodeling of 1 bathroom(s) in 5th fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 5th fl with 1 shower pan(s). | $5,000 |
| Oct 13, 2016 | Completed final sign-off Mar 2018 | 217 Richland Av | to comply with complaint 201641242: remodeling (e) kitchen and bathroom on main floor.Details
to comply with complaint 201641242: remodeling (e) kitchen and bathroom on main floor. | $22,000 |
| Jul 11, 2016 | Completed final sign-off Apr 2017 | 871 Page St | bathroom & kitchen remodel: add exhaust fan, tile, bath tub, toilet, sink in bathroom; range, refrigerator & cabinet in kitchen. no change to (e) framing/walls, (e) outlets & lights. no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. all (e) fire separations to remain.Details
bathroom & kitchen remodel: add exhaust fan, tile, bath tub, toilet, sink in bathroom; range, refrigerator & cabinet in kitchen. no change to (e) framing/walls, (e) outlets & lights. no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. all (e) fire separations to remain. | $24,000 |
| Sep 14, 2015 | Never finaled issued May 2016, no final | 871 Page St | adding gas meter. replacing wh. adding 1 elect meter & rewire. remodel basement bathroom. adding gas heater on 2nd flr. no change @ business use area.Details
adding gas meter. replacing wh. adding 1 elect meter & rewire. remodel basement bathroom. adding gas heater on 2nd flr. no change @ business use area. | $50,000 |