Back to bathroom remodel contractors
Geoffrey Andrew Laurin Construction
- Based in
- El Dorado
- On San Francisco permits
- Nov 2014 to Apr 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2021 | Never finaled issued Apr 2021, no final | 2310 Hyde St | remove nd replace bathroom finishes and fixtures on 3rd floor unit#3. no walls to be removed.Details
remove nd replace bathroom finishes and fixtures on 3rd floor unit#3. no walls to be removed. | $100,000 |