Back to bathroom remodel contractors
Genuine Construction Inc.
- Based in
- Millbrae
- On San Francisco permits
- Sep 2012 to Nov 2025
- Last 24 months
- 4 permits filed
54 permits since 2000: 38 completed, 3 in progress, 11 never finaled, 2 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 11 completed, 3 never finaled. Typically 22 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2024 | Completed final sign-off Sep 2025 | 838 Duncan St | interior remodel. conver g/f storage to bedroom, family, play rm,bath (800sf)patio on g/fl at rear. exterior finish at south(st facing) replac with (n) stucco and siding. windows replace. (n)glass sliding doors and ext finsih on north facade. (n)roof deck accessed by internal stairwayDetails
interior remodel. conver g/f storage to bedroom, family, play rm,bath (800sf)patio on g/fl at rear. exterior finish at south(st facing) replac with (n) stucco and siding. windows replace. (n)glass sliding doors and ext finsih on north facade. (n)roof deck accessed by internal stairway | $525,000 |
| Feb 3, 2023 | Completed final sign-off Jul 2025 | 1275 Monterey Bl | exterior: window upgrades on non-street facing windows only. new stucco and dryrot repair work. interior: remodel including bathrooms, kitchen, finishes, electrical, mechanical, and partial plumbing modifications as needed. new habitable space at basement level.Details
exterior: window upgrades on non-street facing windows only. new stucco and dryrot repair work. interior: remodel including bathrooms, kitchen, finishes, electrical, mechanical, and partial plumbing modifications as needed. new habitable space at basement level. | $400,000 |
| Nov 27, 2019 | Completed final sign-off Aug 2020 | 3334 San Bruno Av | apt #3: bathroom and kitchen remodel. like kind cabinets, sinks, countertop, toilets. no moving of walls or doorsDetails
apt #3: bathroom and kitchen remodel. like kind cabinets, sinks, countertop, toilets. no moving of walls or doors | $10,000 |
| Oct 25, 2016 | Completed final sign-off Sep 2018 | 1348 Rhode Island St | interior work only to convert unconditioned space of (e) attic & (e) 1st floor to 890 sq ft of (n) habitable spaces. add 2 (n) bedrooms & 2 (n) bathrooms in attic. add 1 bedroom, full bath, powder room & family room with wet bar on 1st floor. remodel (e) bedrooms, bathroom, living, dining & kitchenDetails
interior work only to convert unconditioned space of (e) attic & (e) 1st floor to 890 sq ft of (n) habitable spaces. add 2 (n) bedrooms & 2 (n) bathrooms in attic. add 1 bedroom, full bath, powder room & family room with wet bar on 1st floor. remodel (e) bedrooms, bathroom, living, dining & kitchen | $50,000 |
| Sep 14, 2016 | Completed final sign-off Nov 2017 | 2235 27th Av | interior remodel only - to convert partial unconditional space (159 sq ft) to (n) habitable space. add 1 bedroom, bath, storage & to convert (e) office to guestroom on 1st floor. remodel (e) bedrooms, bath, living, dining, kitchen on 2nd floorDetails
interior remodel only - to convert partial unconditional space (159 sq ft) to (n) habitable space. add 1 bedroom, bath, storage & to convert (e) office to guestroom on 1st floor. remodel (e) bedrooms, bath, living, dining, kitchen on 2nd floor | $30,000 |
| Apr 13, 2016 | Completed final sign-off Nov 2016 | 646 15th Av | remodel upstairs and downstairs bathrooms, in kind. two bathroomsDetails
remodel upstairs and downstairs bathrooms, in kind. two bathrooms | $39,000 |
| Jul 10, 2015 | Completed final sign-off Jul 2015 | 2166 Quesada Av | in compliance of nov #201552902 to legalize extg family room. bedroom, storage room and bath room at ground floor per plan.Details
in compliance of nov #201552902 to legalize extg family room. bedroom, storage room and bath room at ground floor per plan. | $30,000 |
| Jun 11, 2015 | Completed final sign-off Oct 2015 | 19 Hazelwood Av | remodel e bath and kitchen at 2nd fl. replace e side windows at 2nd flDetails
remodel e bath and kitchen at 2nd fl. replace e side windows at 2nd fl | $25,000 |
| May 28, 2015 | Never finaled issued Jun 2016, no final | 874 28th Av | interior remodel & infill lightwell. convert part of garage to 370 sf of (n) habitable space w/new bedrm & family room, add powder room, lanudry & elevator on 1st floor. infill lightwell on 2nd floor. remodel (e) kitchen and bath. add powder & bath on 2nd & 3rd floors.Details
interior remodel & infill lightwell. convert part of garage to 370 sf of (n) habitable space w/new bedrm & family room, add powder room, lanudry & elevator on 1st floor. infill lightwell on 2nd floor. remodel (e) kitchen and bath. add powder & bath on 2nd & 3rd floors. | $90,000 |
| Mar 10, 2015 | Never finaled issued Mar 2015, no final | 1548 Dolores St | kitchen and bathroom remodel. same configuration. no structural work.Details
kitchen and bathroom remodel. same configuration. no structural work. | $30,000 |
| Jun 30, 2014 | Completed final sign-off Dec 2014 | 227 Shields St | remodel (e) kitchen and bathroom at 2nd floor. remove (e) partition and provide new beams at 2nd floor. new bedroom and bathroon at ground floor. replace existing windows at 1st and 2nd floor. add new rear stairs.Details
remodel (e) kitchen and bathroom at 2nd floor. remove (e) partition and provide new beams at 2nd floor. new bedroom and bathroon at ground floor. replace existing windows at 1st and 2nd floor. add new rear stairs. | $60,000 |
| May 1, 2014 | Completed final sign-off Aug 2014 | 449 Ashbury St | demo existing bathroom and closet, install new plumbing lines, new framing, new skylight, new electrical wiring, new ventilation fan, lighting, new drywall, new shower & tile, new floor tile.Details
demo existing bathroom and closet, install new plumbing lines, new framing, new skylight, new electrical wiring, new ventilation fan, lighting, new drywall, new shower & tile, new floor tile. | $15,000 |
| Mar 7, 2013 | Never finaled issued Aug 2016, no final | 680 Spruce St | renovation of (e) single fam residence to create (n) 2 family residences vertical addition of two additional stories 2 (n)kitchens, 7(n) baths, 9(n) bedrooms, (n) int. stair to extend up to roof (n) ext. decks at 3rd and 4th floors, (n) 2 car garage automatic sprinkler system thru out under separateDetails
renovation of (e) single fam residence to create (n) 2 family residences vertical addition of two additional stories 2 (n)kitchens, 7(n) baths, 9(n) bedrooms, (n) int. stair to extend up to roof (n) ext. decks at 3rd and 4th floors, (n) 2 car garage automatic sprinkler system thru out under separate | $563,000 |
| Feb 1, 2013 | Completed final sign-off Aug 2013 | 823 Dwight St | add 1 bedroom, 1 bathroom, family room at ground floor. replace (e) siding with stucco in front of (e) building. remove (e) partition walls & provide new beams. add new exterior stairs with landing at 2nd floorDetails
add 1 bedroom, 1 bathroom, family room at ground floor. replace (e) siding with stucco in front of (e) building. remove (e) partition walls & provide new beams. add new exterior stairs with landing at 2nd floor | $30,000 |