General Lau Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Mar 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2018 | Expired or cancelled cancelled Jun 2018 | 1253 09th Av | ti - demo only, remove front walls (offices)Details
ti - demo only, remove front walls (offices) | $7,500 |
| Sep 6, 2017 | Completed final sign-off Apr 2018 | 2631 Lincoln Wy | convert interior staircase to powder room on level 1 unit & create 2nd bathroom in interior staircase in level 2 units. no work to exterior or hori or vert addition.Details
convert interior staircase to powder room on level 1 unit & create 2nd bathroom in interior staircase in level 2 units. no work to exterior or hori or vert addition. | $28,000 |
| Jun 24, 2011 | Completed final sign-off Jul 2011 | 63 West View Av | repair front steps less than 50% in-kind.Details
repair front steps less than 50% in-kind. | $4,000 |
| May 27, 2010 | Completed final sign-off Oct 2010 | 74 Curtis St | first floor alteration to add 2 bedrooms and one full bath roomDetails
first floor alteration to add 2 bedrooms and one full bath room | $35,000 |
| Feb 26, 2010 | Completed final sign-off Apr 2010 | 5320 Geary Bl | sheetrock 5/8 in 4x8 areaDetails
sheetrock 5/8 in 4x8 area | $2,800 |
| Aug 6, 2007 | Completed final sign-off Sep 2007 | 160 Blake St | repair fire damage for apt# 2 & apt# 4. kitchen & 1 bedroom sheet rock, repair flooring. no structure work. require by city inspector, correction notice attached.Details
repair fire damage for apt# 2 & apt# 4. kitchen & 1 bedroom sheet rock, repair flooring. no structure work. require by city inspector, correction notice attached. | $5,000 |
| Jun 26, 2001 | Completed final sign-off Nov 2002 | 3140 Lyon St | alt to existing room and deck enclose deckDetails
alt to existing room and deck enclose deck | $22,000 |