Gene Catania Construction
- Based in
- Concord
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 8 permits filed
33 permits since 2000: 21 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 1 days from filing to permit and 6 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2023 | Completed final sign-off Aug 2023 | 261 Silver Av | bath added 2nd fl."as built". relocation wet bar added. reconfigure deck and walls. railing extention up to 42" in height to remain open and transparent. administrative: as builtDetails
bath added 2nd fl."as built". relocation wet bar added. reconfigure deck and walls. railing extention up to 42" in height to remain open and transparent. administrative: as built | $500 |