Back to bathroom remodel contractors
Gee Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Oct 2025
- Last 24 months
- 1 permit filed
66 permits since 2000: 56 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 25 completed, 5 never finaled, 1 expired or cancelled. Typically 15 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2022 | Never finaled issued Apr 2022, no final | 278 18th Av | 3rd floor remodel convert existing sunroom to media, remodel existing kitchen and living room remodel (e) bedrooms and bathroom and add two new baths.Details
3rd floor remodel convert existing sunroom to media, remodel existing kitchen and living room remodel (e) bedrooms and bathroom and add two new baths. | $40,000 |
| Jan 24, 2022 | Completed final sign-off Feb 2023 | 155 Paris St | comply w/ complaint #202183995, 202044027 & 202286710: construct 1 bedroom, 1 bathroom, family room & media room at g/f. remodel (e) kitchen, relocate (e) bathroom, & repair (e) interior staircase at 2/f. construct 1 bathroom & replace (e) sheetrock w/ new at 3/f.Details
comply w/ complaint #202183995, 202044027 & 202286710: construct 1 bedroom, 1 bathroom, family room & media room at g/f. remodel (e) kitchen, relocate (e) bathroom, & repair (e) interior staircase at 2/f. construct 1 bathroom & replace (e) sheetrock w/ new at 3/f. | $125,000 |
| Nov 19, 2021 | Never finaled issued Apr 2022, no final | 250 18th Av | 1/f:remodel g/f space as habitable common space for all 3 units. enlarge extg work room to have a sunroom. a media rm & remodel an exgt bath.remodel extg garage area & add a nw storage& mech rm. 3rd fl: no change for rear unit 252-b & remodel extg front unit 252-a.Details
1/f:remodel g/f space as habitable common space for all 3 units. enlarge extg work room to have a sunroom. a media rm & remodel an exgt bath.remodel extg garage area & add a nw storage& mech rm. 3rd fl: no change for rear unit 252-b & remodel extg front unit 252-a. | $100,000 |
| Aug 18, 2021 | Completed final sign-off Sep 2021 | 332 Cresta Vista Dr | remodel (1) bathroom no layout change. lighting h.e. and controlled with vacancy sensorDetails
remodel (1) bathroom no layout change. lighting h.e. and controlled with vacancy sensor | $8,000 |
| Aug 4, 2021 | Completed final sign-off Aug 2022 | 126 Colby St | remodel 1 kitchen and 3 bathrooms in-kind. replace 2 windows, not visible from street. max. u-factor = 0.40 (replacement) all in kind. no wall layout change.Details
remodel 1 kitchen and 3 bathrooms in-kind. replace 2 windows, not visible from street. max. u-factor = 0.40 (replacement) all in kind. no wall layout change. | $30,000 |
| Jun 3, 2021 | Completed final sign-off Jun 2022 | 1000 Potrero Av | change use from grocery store to restaurant. relocate mop sink to storage area. add a drain hole in bathroom.Details
change use from grocery store to restaurant. relocate mop sink to storage area. add a drain hole in bathroom. | $6,500 |
| Oct 28, 2020 | Completed final sign-off Dec 2021 | 1622 Balboa St | add 1/2 bath in basement, remodel kitchen & (e) bathroom, add 1 bathroom on 1/f (1622) & add office adjascent to living room.Details
add 1/2 bath in basement, remodel kitchen & (e) bathroom, add 1 bathroom on 1/f (1622) & add office adjascent to living room. | $120,000 |
| Sep 21, 2020 | Completed final sign-off Dec 2020 | 2414 Jones St | replace bathtub and shower, bathroom fixtures, insulation. replace tiles on walls and floor, replace toiletDetails
replace bathtub and shower, bathroom fixtures, insulation. replace tiles on walls and floor, replace toilet | $8,000 |
| Sep 8, 2020 | Completed final sign-off Nov 2020 | 32 Edinburgh St | 1/f: add (2) bedrooms, (2) bath, laundry & media roomDetails
1/f: add (2) bedrooms, (2) bath, laundry & media room | $65,000 |
| Dec 6, 2018 | Completed final sign-off Nov 2019 | 2727 Gough St | rev to pa# 201711164161; 1st flr - reconf (e) conditional space layout w/a bedroom, office, mech rm & media rm. re-tile ext stairway in kind. 2nd flr - open platform to create open visual stairway btw 1st/2nd. remodel (e) kitchen, full bath & power rm. remove walls to create open kitchenDetails
rev to pa# 201711164161; 1st flr - reconf (e) conditional space layout w/a bedroom, office, mech rm & media rm. re-tile ext stairway in kind. 2nd flr - open platform to create open visual stairway btw 1st/2nd. remodel (e) kitchen, full bath & power rm. remove walls to create open kitchen | $50,000 |
| Nov 6, 2018 | Completed final sign-off Jan 2020 | 447 Edinburgh St | 2nd fl: reconfig. int. layout per plan, 3rd fl: add 1 bed, 1 full bath, walk in closet, 1 office & storage.Details
2nd fl: reconfig. int. layout per plan, 3rd fl: add 1 bed, 1 full bath, walk in closet, 1 office & storage. | $60,000 |
| Nov 5, 2018 | Completed final sign-off Jul 2019 | 262 Vienna St | construct 2 bedrooms, one full bath at ground floor. convert closet to powder room at main level. repair dry rots at rear of property, replace with wood siding.Details
construct 2 bedrooms, one full bath at ground floor. convert closet to powder room at main level. repair dry rots at rear of property, replace with wood siding. | $30,000 |
| Oct 18, 2018 | Completed final sign-off Apr 2020 | 163 Paris St | addition of (n) accessory dwelling unit (adu) w/ (1)(n) bath, kitchen & living area per ordinance #95-17Details
addition of (n) accessory dwelling unit (adu) w/ (1)(n) bath, kitchen & living area per ordinance #95-17 | $50,000 |
| Sep 5, 2018 | Completed final sign-off Nov 2018 | 436 35th Av | work occurring in unit 436: partial bathroom remodel (approx 5'x8') & kitchen (approx 10'x12'), replace in same locationsDetails
work occurring in unit 436: partial bathroom remodel (approx 5'x8') & kitchen (approx 10'x12'), replace in same locations | $35,000 |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 2727 Gough St | rev to pa# 201711164161; 1st fl-relocat laundry unit, enlarge office area, 2nd fl- add a 3-fixtures bathroom per plan, re-configuration bathroom & powder layout, re-configure kithchen layout per planDetails
rev to pa# 201711164161; 1st fl-relocat laundry unit, enlarge office area, 2nd fl- add a 3-fixtures bathroom per plan, re-configuration bathroom & powder layout, re-configure kithchen layout per plan | $30,000 |
| May 11, 2018 | Completed final sign-off Nov 2018 | 209 Somerset St | construct one bedroom, one laundry room and one full bathroom at ground fl.Details
construct one bedroom, one laundry room and one full bathroom at ground fl. | $25,000 |
| Nov 16, 2017 | Completed final sign-off Nov 2019 | 2727 Gough St | 1/f: reconfigure (e) conditional space layout w/a bedroom, office & media room per plan. retile exterior stairway in kind. 2/f : open platform to create open visual stairway between 1st & 2nd fl per plan. remodel (e) kitchen, full bath & powder rm per plan. remove walls to create open kitchen.Details
1/f: reconfigure (e) conditional space layout w/a bedroom, office & media room per plan. retile exterior stairway in kind. 2/f : open platform to create open visual stairway between 1st & 2nd fl per plan. remodel (e) kitchen, full bath & powder rm per plan. remove walls to create open kitchen. | $50,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2017 | 626 17th Av | repair / remodel (e) bathroom by replacing bathtub with shower pan. new lavaratory, 1.25 gal toilet, exhaust fan, gfi outlet and led light fixtures in compliance with all applicable codes. no structural work involved.Details
repair / remodel (e) bathroom by replacing bathtub with shower pan. new lavaratory, 1.25 gal toilet, exhaust fan, gfi outlet and led light fixtures in compliance with all applicable codes. no structural work involved. | $6,500 |
| Mar 13, 2017 | Expired or cancelled expired Oct 2019 | 707 Faxon Av | provide 3 new bedrooms, 2 bathrooms and laundry at ground floor. remodel (e) kitchen and bath on 2nd floor. provide new bath on 2nd floor; replace (e) interior stairs. replace (e) windows per plan, non visible from street. structural work included.Details
provide 3 new bedrooms, 2 bathrooms and laundry at ground floor. remodel (e) kitchen and bath on 2nd floor. provide new bath on 2nd floor; replace (e) interior stairs. replace (e) windows per plan, non visible from street. structural work included. | $80,000 |
| Sep 30, 2016 | Completed final sign-off Jan 2026 | 126 Mullen Av | add 512 2nd floor at (e) attic/roof (2 bedrooms & 2 bathrooms). remodel kitchen & new bathroom; new mechanical, plumbing and electrical. foundation replacementDetails
add 512 2nd floor at (e) attic/roof (2 bedrooms & 2 bathrooms). remodel kitchen & new bathroom; new mechanical, plumbing and electrical. foundation replacement | $150,000 |
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 2455 17th Av | revision to ref pa 201510169981 add a half bath on the 2nd flr adjacent on the kitchen as shown on the previous approved plans.Details
revision to ref pa 201510169981 add a half bath on the 2nd flr adjacent on the kitchen as shown on the previous approved plans. | $3,000 |
| Aug 15, 2016 | Completed final sign-off Sep 2018 | 554 Anderson St | add 3 bedrooms and 3 bathrooms. new metal spiral stair case.Details
add 3 bedrooms and 3 bathrooms. new metal spiral stair case. | $10,000 |
| Feb 25, 2016 | Completed final sign-off Dec 2016 | 7 Shawnee Av | interior remodel, add 2 bedrooms, 2 full baths, 1 laundry room, 1 storage at garage. no structural work under this permitDetails
interior remodel, add 2 bedrooms, 2 full baths, 1 laundry room, 1 storage at garage. no structural work under this permit | $40,000 |
| Oct 16, 2015 | Never finaled issued Nov 2015, no final | 2455 17th Av | gr fl - enclose new bedroom with new bathroom below (e) bedroom at 2nd fl. add 1 new media room at ground floor.Details
gr fl - enclose new bedroom with new bathroom below (e) bedroom at 2nd fl. add 1 new media room at ground floor. | $36,000 |
| Aug 24, 2015 | Completed final sign-off Feb 2016 | 2971 25th Av | turn (e) powder into full bath on lower floor per plan. add 2 full baths, 1 bedroom, entertainment on lower floor, relocate (e) storage per planDetails
turn (e) powder into full bath on lower floor per plan. add 2 full baths, 1 bedroom, entertainment on lower floor, relocate (e) storage per plan | $35,000 |
| Aug 21, 2015 | Completed final sign-off Nov 2015 | 642 23rd Av | remodel existing bathroom at 2nd floor. add a new bathroom at 2nd floor.Details
remodel existing bathroom at 2nd floor. add a new bathroom at 2nd floor. | $15,000 |
| Jul 22, 2015 | Completed final sign-off Dec 2015 | 1278 24th Av | remove walls at kitchen on 2nd fl per plan. add 1 bath and remodel 1 bath on 3rd fl per planDetails
remove walls at kitchen on 2nd fl per plan. add 1 bath and remodel 1 bath on 3rd fl per plan | $20,000 |
| Apr 23, 2015 | Completed final sign-off Jan 2016 | 1955 47th Av | add 1 bedroom, entertainment room, 1 bathroom on 1st flr. increase in sq ft. infill 1st floor. bathroom remodel on 2end flr.Details
add 1 bedroom, entertainment room, 1 bathroom on 1st flr. increase in sq ft. infill 1st floor. bathroom remodel on 2end flr. | $10,000 |
| Dec 26, 2014 | Completed final sign-off May 2015 | 745 Vicente St | remodel e bath and add 1 new bath at 2nd fl. 1 new 1/2 bathrm at gr fl replace windows 2nd flDetails
remodel e bath and add 1 new bath at 2nd fl. 1 new 1/2 bathrm at gr fl replace windows 2nd fl | $45,000 |
| Dec 2, 2013 | Completed final sign-off May 2014 | 2500 35th Av | revision to pa#201311071345 to relocate (e) stair from 2nd floor to ground floor, infill (e) lightwell and remodel (e) kitchen & bathroom room, install new skylights at 2/f per plan.Details
revision to pa#201311071345 to relocate (e) stair from 2nd floor to ground floor, infill (e) lightwell and remodel (e) kitchen & bathroom room, install new skylights at 2/f per plan. | $16,000 |
| Nov 7, 2013 | Completed final sign-off May 2014 | 2500 35th Av | 1)2 new bath rooms, 3 bedrooms, and one laundry area to be constructed at ground floor. 2)convert extg closet area to be new bath room at 2nd floor. 3)replace extg windows per plan.Details
1)2 new bath rooms, 3 bedrooms, and one laundry area to be constructed at ground floor. 2)convert extg closet area to be new bath room at 2nd floor. 3)replace extg windows per plan. | $50,000 |