Gavins Construction
- Based in
- San Mateo
- On San Francisco permits
- Sep 2010 to Jun 2015
- Last 24 months
- 0 permits filed
16 permits since 2000: 8 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 88 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2012 | Completed final sign-off Nov 2012 | 2533 Gough St | replace rotted framing on deck as necessary. less than 50% dry rot repair. no change in size or shape. not visible from the streetDetails
replace rotted framing on deck as necessary. less than 50% dry rot repair. no change in size or shape. not visible from the street | $2,000 |
| Apr 21, 2011 | Completed final sign-off May 2012 | 11 17th Av | new 500 sf wood deck over existing flat roof. new metal spiral stair up to roof deck with new fire-rated property line wall.Details
new 500 sf wood deck over existing flat roof. new metal spiral stair up to roof deck with new fire-rated property line wall. | $22,000 |