Back to bathroom remodel contractors
Gavin Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Dec 2022 to Jun 2026
- Last 24 months
- 9 permits filed
19 permits since 2000: 15 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | Completed final sign-off May 2026 | 1375 18th Av | unit# 4: kitchen and bath remodel (work in-kind). electrical upgrade (panel).Details
unit# 4: kitchen and bath remodel (work in-kind). electrical upgrade (panel). | $20,000 |
| Dec 9, 2025 | Completed final sign-off Jun 2026 | 554 Natoma St | unit a: remodel of kitchen and two bathrooms. no structual work, update electrical and plumbing, new gas lie for furnace.Details
unit a: remodel of kitchen and two bathrooms. no structual work, update electrical and plumbing, new gas lie for furnace. | $35,000 |
| Nov 7, 2025 | Completed final sign-off May 2026 | 1201 Shrader St | bathroom renovation: remove and repplace existing baseboard, tiles, shower, bathtub, bidet toilet, shower valve, fixtures. remove jacuzzi feature in tub. insall new shwer door panel, ceiling lights, extractor fan. install double sink in vanity.Details
bathroom renovation: remove and repplace existing baseboard, tiles, shower, bathtub, bidet toilet, shower valve, fixtures. remove jacuzzi feature in tub. insall new shwer door panel, ceiling lights, extractor fan. install double sink in vanity. | $30,000 |
| May 19, 2025 | In progress issued Oct 2025 | 2508 Bush St | rear bldg, 2508 a bush st 1st fl - existing brick foundation replacement; addition of new bedroom and bathroom; 2nd fl - new staircasew to connect 1st and 2nd fl; existing bathroom remodelDetails
rear bldg, 2508 a bush st 1st fl - existing brick foundation replacement; addition of new bedroom and bathroom; 2nd fl - new staircasew to connect 1st and 2nd fl; existing bathroom remodel | $80,000 |
| Feb 10, 2023 | Never finaled issued Feb 2023, no final | 3819 Divisadero St | unit #5: remove exisitng cabinets doors, replace counter top- replace sink install new sink and garbage disposal install new floor, replace lights and in fan bathroom, replace bath tub, vanity, sink and install new fan, shower valve. no structural work.Details
unit #5: remove exisitng cabinets doors, replace counter top- replace sink install new sink and garbage disposal install new floor, replace lights and in fan bathroom, replace bath tub, vanity, sink and install new fan, shower valve. no structural work. | $18,000 |