Garibaldi Plumbing Company Inc
- Based in
- Burlingame
- On San Francisco permits
- Sep 2000 to Aug 2024
- Last 24 months
- 0 permits filed
68 permits since 2000: 58 completed, 1 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 12 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2015 | Completed final sign-off Jan 2016 | 290 28th Av | revision to pa 2015 0413 3446 - install new footing per engineers drawing ssk1. strengthening (e) damaged joist - sister w/like size lvl. replace damaged main grider, repair dry rot at (e) rear deck in kind using pt lumber less than 50%. new railing per code. no change to ht or sizeDetails
revision to pa 2015 0413 3446 - install new footing per engineers drawing ssk1. strengthening (e) damaged joist - sister w/like size lvl. replace damaged main grider, repair dry rot at (e) rear deck in kind using pt lumber less than 50%. new railing per code. no change to ht or size | $15,000 |