Back to bathroom remodel contractors
Gama Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Sep 2026
- Last 24 months
- 6 permits filed
21 permits since 2000: 8 completed, 8 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
9 bathroom remodel permits: 4 completed, 4 in progress, 1 expired or cancelled. Typically 112 days from filing to permit and 676 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1446 Florida St | revision to 202310048007 and planning prj 2024-011309. install dormers at north and south roof. increase roof height at rear family room. install new interior stair from 1st to 3rd fl. 2 new full baths at 3rd fl. new rear deck. storage converted to living space and 1 new bath. install 1 exteriorDetails
revision to 202310048007 and planning prj 2024-011309. install dormers at north and south roof. increase roof height at rear family room. install new interior stair from 1st to 3rd fl. 2 new full baths at 3rd fl. new rear deck. storage converted to living space and 1 new bath. install 1 exterior | $110,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 3140 Clay St | remodel kitchen and bath, convert tub to shower pan, no changes to layout.Details
remodel kitchen and bath, convert tub to shower pan, no changes to layout. | $75,000 |
| Dec 10, 2025 | In progress issued Apr 2026 | 45 Glenbrook Av | 1st fl:add wet bar. reconfigure laundry & mech room,relocatebathroom & reconfigure bedroom and bathrooms 2nd fl: convert bedroom to den w/ wet bar. expand kitchen reconfigure powder & storage room. 3rd fl: open vault ceiling. stair access to 2nd fl. exterior changes sharing under bpa.2026-0326-8338.Details
1st fl:add wet bar. reconfigure laundry & mech room,relocatebathroom & reconfigure bedroom and bathrooms 2nd fl: convert bedroom to den w/ wet bar. expand kitchen reconfigure powder & storage room. 3rd fl: open vault ceiling. stair access to 2nd fl. exterior changes sharing under bpa.2026-0326-8338. | $250,000 |
| Oct 4, 2023 | In progress issued May 2024 | 1446 Florida St | kitchen renovation, relocate (e) full bath and powder room. 1 story lightwell infill at northside (not visble to the street) adjacent to neighbor's blank wall.Details
kitchen renovation, relocate (e) full bath and powder room. 1 story lightwell infill at northside (not visble to the street) adjacent to neighbor's blank wall. | $65,000 |
| Feb 9, 2023 | Expired or cancelled withdrawn Apr 2024 | 1446 Florida St | remodel kitchen and bathDetails
remodel kitchen and bath | $90,000 |
| Jan 24, 2023 | Completed final sign-off Jan 2024 | 3526 19th St | remodel 2 (e) existing bathrooms, replace swing door with pocket door, demolish a wall & build new wall.Details
remodel 2 (e) existing bathrooms, replace swing door with pocket door, demolish a wall & build new wall. | $30,000 |
| Aug 24, 2022 | Completed final sign-off Jan 2024 | 3524 19th St | remodel one kitchen and two baths at 3526 19th st. remodel one kitchen and 1 bath ay 3524 19th street. all non structural.Details
remodel one kitchen and two baths at 3526 19th st. remodel one kitchen and 1 bath ay 3524 19th street. all non structural. | $215,000 |
| Feb 23, 2018 | Completed final sign-off May 2023 | 4363 26th St | vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck.Details
vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck. | $650,000 |
| Apr 15, 2015 | Completed final sign-off Jun 2020 | 240 Chenery St | (rear bldg) renovation to an (e) fire damaged house. horizontal extension at existing top floor. adding bedroom and bath. maher ord n/a.Details
(rear bldg) renovation to an (e) fire damaged house. horizontal extension at existing top floor. adding bedroom and bath. maher ord n/a. | $760,000 |