Back to bathroom remodel contractors
G W Constructio Co
- Based in
- San Mateo
- On San Francisco permits
- Aug 2007 to Aug 2025
- Last 24 months
- 1 permit filed
3 permits since 2000: 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 56 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2024 | Completed final sign-off Aug 2024 | 419 Laguna St | apt 2: no movement of wall or structure: moving existing vanity 7" inches to left. so we can add stackable washer/ dryer inside (e) bathroom.Details
apt 2: no movement of wall or structure: moving existing vanity 7" inches to left. so we can add stackable washer/ dryer inside (e) bathroom. | $5,000 |
| Aug 3, 2007 | Expired or cancelled expired Jan 2011 | 969 Rhode Island St | repair outside deck and repair water damage in bathroom of wall and ceiling. deck repalce tile and rotten area. no structural work, repair in kind, rear deckDetails
repair outside deck and repair water damage in bathroom of wall and ceiling. deck repalce tile and rotten area. no structural work, repair in kind, rear deck | $8,000 |