Back to bathroom remodel contractors
G M Remodeling
- Based in
- San Leandro
- On San Francisco permits
- Jun 2010 to Dec 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 336 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2015 | Completed final sign-off May 2017 | 333 Bush St | unit #3903: demo minimal interior partition walls. move plumbing in kitchen. move plumbing in bath, new shower. reconfigure space at bath/kitchen/closet as shown on plans. finish as needed.Details
unit #3903: demo minimal interior partition walls. move plumbing in kitchen. move plumbing in bath, new shower. reconfigure space at bath/kitchen/closet as shown on plans. finish as needed. | $100,000 |
| Jun 7, 2010 | Completed final sign-off Nov 2010 | 743 Broderick St | convert (e) closet to bathroom. work on 3rd floor, upper level/3rd floor. run plumbing, rough electrtical for gfi outlets & lights. finish with tileDetails
convert (e) closet to bathroom. work on 3rd floor, upper level/3rd floor. run plumbing, rough electrtical for gfi outlets & lights. finish with tile | $6,800 |