G F Watson Construction
- Based in
- El Sobrante
- On San Francisco permits
- Dec 2009 to Jan 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2010 | Completed final sign-off Mar 2010 | 143 Detroit St | remove stucco at bottom of bay window. repair dryrot and patch stucco, facing street. install a 2" cont. vent @ bottom of bay.Details
remove stucco at bottom of bay window. repair dryrot and patch stucco, facing street. install a 2" cont. vent @ bottom of bay. | $1,000 |
| Dec 22, 2009 | Completed final sign-off Mar 2010 | 143 Detroit St | replace (e) front stairs, add handrails, move lights & add lights to stairway wall, replace wall on (e) stairs per plans.Details
replace (e) front stairs, add handrails, move lights & add lights to stairway wall, replace wall on (e) stairs per plans. | $8,500 |