Back to bathroom remodel contractors
G-Con General Construction
- Based in
- Hayward
- On San Francisco permits
- Jun 2014 to May 2019
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2015 | Completed final sign-off Aug 2015 | 3390 16th St | bathroom remodel- change tiles, tub, cabinet, window, relocate switches & receptacle, relocate toilet & sink, replace exhaust fan.Details
bathroom remodel- change tiles, tub, cabinet, window, relocate switches & receptacle, relocate toilet & sink, replace exhaust fan. | $4,500 |
| Jun 10, 2014 | Completed final sign-off Apr 2015 | 3390 16th St | bathroom remodel:convert powder room to full bathroom. electrical: replace panel box to 12-24, run dedicated 20a to bathroom. plumbing:install new water supply line & drains & vent. mechanical: install exhuast fan & heating register in bathroom.Details
bathroom remodel:convert powder room to full bathroom. electrical: replace panel box to 12-24, run dedicated 20a to bathroom. plumbing:install new water supply line & drains & vent. mechanical: install exhuast fan & heating register in bathroom. | $7,000 |