Back to bathroom remodel contractors
Future Vision Remodeling Inc.
- Based in
- Tarzana
- On San Francisco permits
- Apr 2017 to Jun 2026
- Last 24 months
- 1 permit filed
22 permits since 2000: 13 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2022 | Completed final sign-off Dec 2022 | 424 Grafton Av | kitchen & bathroom remodel. remove wall between kiitchen & living room. install new floor in kitchen. add kitchen island. relocate toilet & remove (e) shower. tub position like for like. open a niche in tub area.Details
kitchen & bathroom remodel. remove wall between kiitchen & living room. install new floor in kitchen. add kitchen island. relocate toilet & remove (e) shower. tub position like for like. open a niche in tub area. | $60,000 |
| Jul 13, 2020 | Completed final sign-off Dec 2020 | 356 Warren Dr | complete kitchen remodeling, complete bathroom remodeling.Details
complete kitchen remodeling, complete bathroom remodeling. | $70,000 |
| Jan 30, 2020 | Completed final sign-off Mar 2020 | 140 South Van Ness Av | 1) bathroom remodel. like for like (no relocation): upgrade plumbing, electrical & mechanical up to codeDetails
1) bathroom remodel. like for like (no relocation): upgrade plumbing, electrical & mechanical up to code | $14,000 |
| Jan 16, 2020 | Completed final sign-off Jun 2020 | 1568 Union St | unit 102: general remodel of 2 bathrooms and kitchen like fo rlike. upgrade plumbing, electrical and mechanical up to code. change master bathroom to shower.Details
unit 102: general remodel of 2 bathrooms and kitchen like fo rlike. upgrade plumbing, electrical and mechanical up to code. change master bathroom to shower. | $40,000 |
| Nov 13, 2019 | Completed final sign-off Feb 2020 | 2750 Harrison St | bathroom remodel relocate toilet, change tub to shower and relocate, change 2 doros to pocket doorsDetails
bathroom remodel relocate toilet, change tub to shower and relocate, change 2 doros to pocket doors | $13,000 |
| Nov 1, 2019 | Completed final sign-off Jul 2020 | 1995 42nd Av | no sturctural, ground fl work only. construct full bath, walk in closet. relocate e water heater, e furnace, e laundry. demo e window at bedroom, new 68x80 sliding patio drDetails
no sturctural, ground fl work only. construct full bath, walk in closet. relocate e water heater, e furnace, e laundry. demo e window at bedroom, new 68x80 sliding patio dr | $10,000 |
| Mar 7, 2018 | Completed final sign-off Jul 2018 | 216 03rd Av | bathroom remodel, no wall changes, plumbing and elecDetails
bathroom remodel, no wall changes, plumbing and elec | $15,000 |
| May 10, 2017 | Completed final sign-off May 2018 | 674 Bay St | bathroom remodeling "like for like. upgrade electrical plumbing & electrical. 3 x new recess light above tub, toilet and vanity. note: maintain occupancy separatjion at recessed lights.Details
bathroom remodeling "like for like. upgrade electrical plumbing & electrical. 3 x new recess light above tub, toilet and vanity. note: maintain occupancy separatjion at recessed lights. | $12,000 |