Back to bathroom remodel contractors
Fulcrum Point Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2015 to Apr 2023
- Last 24 months
- 0 permits filed
25 permits since 2000: 22 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 7 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2021 | Completed final sign-off May 2023 | 27 Pomona St | enclose 1/f @ rear porch below (e) 2/f with new family room, add bedroom 1/f, remodel kitchen & relocate bath @ 2/f, remove/relocate attic access stair.Details
enclose 1/f @ rear porch below (e) 2/f with new family room, add bedroom 1/f, remodel kitchen & relocate bath @ 2/f, remove/relocate attic access stair. | $250,000 |
| Sep 16, 2020 | Completed final sign-off Feb 2021 | 88 Hoff St | new finishes and fixtures in lower 1/2 bath, master bath and kitchen, fixtures locations not to change, new flooring througout unitDetails
new finishes and fixtures in lower 1/2 bath, master bath and kitchen, fixtures locations not to change, new flooring througout unit | $32,000 |
| Oct 4, 2019 | Completed final sign-off Jun 2020 | 1765 10th Av | remodel 3rd fl includes bath remodel, new closet, 3 replacement windows, 3 new windows, new gas fireplace, relocate roof access door and steps to roof, partial exterior siding replacement at 3rd flDetails
remodel 3rd fl includes bath remodel, new closet, 3 replacement windows, 3 new windows, new gas fireplace, relocate roof access door and steps to roof, partial exterior siding replacement at 3rd fl | $60,262 |
| Jun 11, 2019 | Completed final sign-off Oct 2019 | 430 Nevada St | bathroom renovation. new shower encloser with steam generator. new tile. infill extg window. relocate subpanel at exterior into garage area.Details
bathroom renovation. new shower encloser with steam generator. new tile. infill extg window. relocate subpanel at exterior into garage area. | $25,000 |
| Jun 4, 2019 | Completed final sign-off Sep 2019 | 61 Fair Av | bathroom remodel. all plumbing locations in same place as (e) new tub, tile vanityDetails
bathroom remodel. all plumbing locations in same place as (e) new tub, tile vanity | $15,000 |
| Aug 17, 2018 | Completed final sign-off Jan 2019 | 58 Beaver St | reconfiguration of existing bath and water closet. new steam shower in location. toilet & vanity in new location. work at uppper level.Details
reconfiguration of existing bath and water closet. new steam shower in location. toilet & vanity in new location. work at uppper level. | $30,000 |
| Feb 5, 2018 | Completed final sign-off Apr 2020 | 89 Lake Forest Ct | voluntary seismic retrofit to (e) foundations w/added shearwalls interior renovations of (e) open garage space not conditions art studio space with sink. new bathroom, storage rm and laundry . new ext door & windows. new hydronic systemDetails
voluntary seismic retrofit to (e) foundations w/added shearwalls interior renovations of (e) open garage space not conditions art studio space with sink. new bathroom, storage rm and laundry . new ext door & windows. new hydronic system | $75,000 |
| Jan 18, 2018 | Completed final sign-off Dec 2018 | 65 Eureka St | kitchen remodel, demo e bath, extend kitchen into old bathroom space, open up wall between kitchen and dining room and entry living rm. ref 201509227729 for 2nd/3rd fl remodelDetails
kitchen remodel, demo e bath, extend kitchen into old bathroom space, open up wall between kitchen and dining room and entry living rm. ref 201509227729 for 2nd/3rd fl remodel | $50,000 |
| Jun 27, 2016 | Completed final sign-off Jul 2017 | 58 Gladys St | interior renovation of (e) kitchen. new bath and laundry at upper level within (e) space. 3 new skylights. replace upper level bedroom doors.Details
interior renovation of (e) kitchen. new bath and laundry at upper level within (e) space. 3 new skylights. replace upper level bedroom doors. | $75,000 |
| Jun 14, 2016 | Completed final sign-off Sep 2017 | 532 45th Av | 2nd floor : renovate kitchen, add half bath, add deck to back of house with new windows & doors conncected to living space. 3rd floor: new master bathroom.Details
2nd floor : renovate kitchen, add half bath, add deck to back of house with new windows & doors conncected to living space. 3rd floor: new master bathroom. | $130,000 |
| Jun 13, 2016 | Completed final sign-off Nov 2016 | 760 Duboce Av | remodel of 1st & 2nd floors baths, new lighting , fans & electrical work in (e) baths new plumbing fixtures& tub in (e) 2nd floor bath, new shower pan & plumbing fixtures in (e) first floor bath at storage area between bath, new type x sheetrockDetails
remodel of 1st & 2nd floors baths, new lighting , fans & electrical work in (e) baths new plumbing fixtures& tub in (e) 2nd floor bath, new shower pan & plumbing fixtures in (e) first floor bath at storage area between bath, new type x sheetrock | $25,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2025 | 25 Hartford St | renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms &Details
renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms & | $405,044 |
| Jun 11, 2015 | Completed final sign-off Dec 2015 | 2242 15th St | 2nd fl remodel. remodel kitchen and 1 bath, add 1 new half bath in kitchen area. new lighting, elec in kitchen, bath, dining, bedroom, 1/2 bath.new exhaust fans in e bath, new 1/2 bath. demo load bearing wall,replace with new beam/post, demo non bearing walls. remove 2 e doorsDetails
2nd fl remodel. remodel kitchen and 1 bath, add 1 new half bath in kitchen area. new lighting, elec in kitchen, bath, dining, bedroom, 1/2 bath.new exhaust fans in e bath, new 1/2 bath. demo load bearing wall,replace with new beam/post, demo non bearing walls. remove 2 e doors | $35,000 |