Front Row Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Sep 2017
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2017 | Completed final sign-off Oct 2018 | 1106 Fell St | remove & replace entrance stair in kind. remvoe existing wood treads & stringers @ entry, replace with new steel stringers & terrazzo precast treads.Details
remove & replace entrance stair in kind. remvoe existing wood treads & stringers @ entry, replace with new steel stringers & terrazzo precast treads. | $25,000 |
| Mar 31, 2014 | Never finaled issued May 2014, no final | 96 Lafayette St | double faced non electric signDetails
double faced non electric sign | $1,000 |
| Dec 18, 2012 | Completed final sign-off Mar 2013 | 68 Uranus Tr | replace existing interior gaurd/handr from 3rd to 4th flrDetails
replace existing interior gaurd/handr from 3rd to 4th flr | $18,176 |
| Jul 1, 2010 | Completed final sign-off Aug 2010 | 184 Ellsworth St | install (n) metal guard rail on (e) entry stair wall to meet current code, top of rail to be 42" above tread nosing & clear opening not to exceed 4" on rail spacing, stair already has an existing hand rail attached to existing house wallDetails
install (n) metal guard rail on (e) entry stair wall to meet current code, top of rail to be 42" above tread nosing & clear opening not to exceed 4" on rail spacing, stair already has an existing hand rail attached to existing house wall | $1,200 |
| Apr 7, 2010 | Completed final sign-off Jun 2010 | 240 28th St | dry rot repair of (e) entry no change in configurationDetails
dry rot repair of (e) entry no change in configuration | $3,500 |
| Jan 6, 2010 | Completed final sign-off Jan 2010 | 2021 Castro St | comply w/physical inspe report cc-5646, remove drywall sections for electrical inspection, install 5 sided fire rated boxes for all recessed lighting, replace drywall, repair defects in garage in fire wall separationDetails
comply w/physical inspe report cc-5646, remove drywall sections for electrical inspection, install 5 sided fire rated boxes for all recessed lighting, replace drywall, repair defects in garage in fire wall separation | $4,200 |
| Oct 13, 2009 | Completed final sign-off Feb 2010 | 153 Caselli Av | bathroom remodel-change tub to shower, replace vanity, lights, toilet, floor tile, sink, plumbing fixtures in (e) locationsDetails
bathroom remodel-change tub to shower, replace vanity, lights, toilet, floor tile, sink, plumbing fixtures in (e) locations | $18,000 |
| Apr 15, 2008 | Completed final sign-off Jun 2008 | 1774 Beach St | change guard rail finish from stucco to wood siding at existing rear roof deck. deck over 5 feet from all property lines.Details
change guard rail finish from stucco to wood siding at existing rear roof deck. deck over 5 feet from all property lines. | $2,800 |