Fresh Start Home Construction
- Based in
- Daly City
- On San Francisco permits
- Aug 2024 to May 2026
- Last 24 months
- 6 permits filed
7 permits since 2000: 5 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 111 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2024 | Completed final sign-off Apr 2025 | 633 06th Av | 1. new 82 sf deck on 2nd level of the (e) 3-unit apt building. 2. install 1-hr fire rated wall along south property line along the length of the new deck. 3. install railing on west side of new deck. 4. install (n) gfci receptacle outside in deck area.Details
1. new 82 sf deck on 2nd level of the (e) 3-unit apt building. 2. install 1-hr fire rated wall along south property line along the length of the new deck. 3. install railing on west side of new deck. 4. install (n) gfci receptacle outside in deck area. | $17,700 |