Freestone Reconstruction Inc
- Based in
- Hayden
- On San Francisco permits
- Oct 2019 to Sep 2026
- Last 24 months
- 5 permits filed
39 permits since 2000: 30 completed, 5 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
16 deck permits: 14 completed, 1 in progress, 1 expired or cancelled. Typically 405 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Sep 2026 | 243 Rey St | like in kind maintenance & repair of decks coatings @ 15 units-237 rey, 257 rey, 271 rey, 273 rey, 281 rey, 295 rey, 298 schwerin + 256,228, 208 schwerin, 1075 sunnydale, 15 garrison, 11 towerside, 21 heritage.Details
like in kind maintenance & repair of decks coatings @ 15 units-237 rey, 257 rey, 271 rey, 273 rey, 281 rey, 295 rey, 298 schwerin + 256,228, 208 schwerin, 1075 sunnydale, 15 garrison, 11 towerside, 21 heritage. | $65,000 |
| Sep 1, 2021 | Expired or cancelled cancelled Jan 2026 | 662 Clarendon Av | less than 50% repair of dryrot damage to (e) wood deck. remove and replace 9e) 4x4 & 4x6 post at deck guardrail. repair in-kindDetails
less than 50% repair of dryrot damage to (e) wood deck. remove and replace 9e) 4x4 & 4x6 post at deck guardrail. repair in-kind | $2,310 |
| May 5, 2021 | Completed final sign-off May 2023 | 608 Clarendon Av | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings.Details
replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $10,000 |
| Apr 22, 2021 | Completed final sign-off May 2023 | 610 Clarendon Av | replace existing cantilevered exterior deck that has been structually compromised by dryout. install new wood support beam and posts w/ concrete footings. no change in egress or deck area.Details
replace existing cantilevered exterior deck that has been structually compromised by dryout. install new wood support beam and posts w/ concrete footings. no change in egress or deck area. | $15,000 |
| Apr 22, 2021 | Completed final sign-off May 2023 | 666 Clarendon Av | replace (e) cantilevered exterior wood deck that has been structurally compromised by dryrot, install new wood support beam and posts with concrete footingsDetails
replace (e) cantilevered exterior wood deck that has been structurally compromised by dryrot, install new wood support beam and posts with concrete footings | $15,000 |
| Dec 23, 2020 | Completed final sign-off May 2023 | 658 Clarendon Av | install (n) wood support beam, posts, diagonal bracing and concrete footings at exterior wood deckDetails
install (n) wood support beam, posts, diagonal bracing and concrete footings at exterior wood deck | $29,250 |
| Nov 9, 2020 | Completed final sign-off May 2023 | 654 Clarendon Av | install new wood support beam and posts at exterior wood deck.Details
install new wood support beam and posts at exterior wood deck. | $15,000 |
| Oct 14, 2020 | Completed final sign-off May 2023 | 668 Clarendon Av | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings.Details
replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $15,000 |
| Oct 13, 2020 | Completed final sign-off May 2023 | 656 Clarendon Av | install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts.Details
install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts. | $5,000 |
| Sep 24, 2020 | Completed final sign-off May 2023 | 664 Clarendon Av | install new wood support beam, posts with concrete footings & diagonal bracing at existing front exterior wood deckDetails
install new wood support beam, posts with concrete footings & diagonal bracing at existing front exterior wood deck | $20,000 |
| Sep 10, 2020 | Completed final sign-off May 2023 | 660 Clarendon Av | install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck.Details
install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck. | $26,980 |
| May 27, 2020 | Completed final sign-off Feb 2021 | 690 Clarendon Av | less than 50% in-kind replacement of rear deckDetails
less than 50% in-kind replacement of rear deck | $1,250 |
| Oct 7, 2019 | Completed final sign-off Feb 2021 | 612 Clarendon Av | deck replacement utilizing wood ledger on the bld wall and post and beam to support the outter ends of the joists. work per engineers plans, work is like for likeDetails
deck replacement utilizing wood ledger on the bld wall and post and beam to support the outter ends of the joists. work per engineers plans, work is like for like | $13,200 |
| Oct 7, 2019 | Completed final sign-off Feb 2021 | 604 Clarendon Av | install new post and bean to retrofit the (e) decks work is like for like work per engineers plansDetails
install new post and bean to retrofit the (e) decks work is like for like work per engineers plans | $4,400 |
| Oct 7, 2019 | Completed final sign-off Apr 2021 | 602 Clarendon Av | install new post and beam to retrofit the (e) decks work is like for like work per engineers plansDetails
install new post and beam to retrofit the (e) decks work is like for like work per engineers plans | $4,400 |
| Oct 7, 2019 | Completed final sign-off Feb 2021 | 670 Clarendon Av | deck replacement utilizing wood ledger on the bld wall and post and beam to support the outter ends of the joists. work per engineers plans, work is like for likeDetails
deck replacement utilizing wood ledger on the bld wall and post and beam to support the outter ends of the joists. work per engineers plans, work is like for like | $13,200 |