Back to bathroom remodel contractors
Fred Pavlow Co. Inc Dba Add-A-Garage
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Mar 2016
- Last 24 months
- 0 permits filed
181 permits since 2000: 116 completed, 19 never finaled, 46 expired or cancelled.
Of the 19 never-finaled permits, 19 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 64 days from filing to permit and 504 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2014 | Completed final sign-off Oct 2016 | 36 Jordan Av | horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind.Details
horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind. | $350,000 |
| May 18, 2012 | Completed final sign-off Oct 2013 | 1751 Broadway | increase size of existing garage and remodel existing 2nd unit located in basement of a 4 story, 2 unit residence. work includes excavation, n concrete slabs, footings at garage, kitchen, bath, and laundry room remodel and new windows at side of basementDetails
increase size of existing garage and remodel existing 2nd unit located in basement of a 4 story, 2 unit residence. work includes excavation, n concrete slabs, footings at garage, kitchen, bath, and laundry room remodel and new windows at side of basement | $85,000 |
| May 19, 2008 | Completed final sign-off Dec 2009 | 2255 Lyon St | remodel of all 4 (e)floors including remove/replace baths & add (1) bath,remove/enlarge (2)windows,add (3)new windows,new walls, plbg,mech,elec,lighting, reconfiguration & addition of some struct elements,conditioning of previously unexcavated,mostly subgrade area within (e) bldg footprint,reroofingDetails
remodel of all 4 (e)floors including remove/replace baths & add (1) bath,remove/enlarge (2)windows,add (3)new windows,new walls, plbg,mech,elec,lighting, reconfiguration & addition of some struct elements,conditioning of previously unexcavated,mostly subgrade area within (e) bldg footprint,reroofing | $1,500,000 |
| Aug 2, 2001 | Expired or cancelled expired Jan 2003 | 1703 Octavia St | install new bathroom and add storage at 1st floorDetails
install new bathroom and add storage at 1st floor | $10,000 |