Back to bathroom remodel contractors
Franklin's Construction
- Based in
- Pittsburg
- On San Francisco permits
- Oct 2011 to Dec 2024
- Last 24 months
- 1 permit filed
9 permits since 2000: 6 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2024 | Completed final sign-off Jan 2026 | 53 Lapham Wy | revision to pa# 202409100483. revise kitchen layout. revise bathroom size. convert portion of garage with new wall to unconditioned workshop area. reconfigure 2/f bathroom. upgrade electric to 200 amp. create furnace closet. add insulation to wall cavities.Details
revision to pa# 202409100483. revise kitchen layout. revise bathroom size. convert portion of garage with new wall to unconditioned workshop area. reconfigure 2/f bathroom. upgrade electric to 200 amp. create furnace closet. add insulation to wall cavities. | $4,000 |
| Sep 10, 2024 | Expired or cancelled expired Jan 2026 | 53 Lapham Wy | remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf.Details
remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf. | $30,000 |
| Jan 31, 2014 | Completed final sign-off Oct 2014 | 938 Le Conte Av | drywall walls and ceiling downstairs/patch upstairs. kitchen (like for like) cabinets/counters floor coverings upstairs for floor and basement. bathrooms (2) new vanities and tile flooring. reinstall doors in basement bedrooms closet and bathrooms.Details
drywall walls and ceiling downstairs/patch upstairs. kitchen (like for like) cabinets/counters floor coverings upstairs for floor and basement. bathrooms (2) new vanities and tile flooring. reinstall doors in basement bedrooms closet and bathrooms. | $18,704 |
| Jun 22, 2012 | Never finaled issued Jun 2012, no final | 226 28th St | bathroom remodel-new floor, tub, vanity & lighting. new shower manifold, pocket doors & tile tub surround. bathroom 7x10 sf. remove and replace light fixtures on the 2nd and 1st floor. cec 150(k) for lighting.Details
bathroom remodel-new floor, tub, vanity & lighting. new shower manifold, pocket doors & tile tub surround. bathroom 7x10 sf. remove and replace light fixtures on the 2nd and 1st floor. cec 150(k) for lighting. | $32,340 |