Back to bathroom remodel contractors
Foxtail Hill Windows & Doors Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Jul 2026
- Last 24 months
- 20 permits filed
169 permits since 2000: 126 completed, 8 in progress, 33 never finaled, 2 expired or cancelled.
Of the 33 never-finaled permits, 7 are 3 to 5 years old, 16 are 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 2 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Sep 2026 | 2587 20th Av | converting portion of the garage into living area. adding a bathroom, concrete patio in the rear yard, and adding a small elevator. all work is within the existing building footprint. new garage door (same size, same location).Details
converting portion of the garage into living area. adding a bathroom, concrete patio in the rear yard, and adding a small elevator. all work is within the existing building footprint. new garage door (same size, same location). | $200,000 |
| Oct 10, 2025 | Completed final sign-off Mar 2026 | 2918 Baker St | replace front door in kind, replace 2 windows in kind, street visible, replace a bathroom window in kind.Details
replace front door in kind, replace 2 windows in kind, street visible, replace a bathroom window in kind. | $12,880 |
| Feb 11, 2021 | Completed final sign-off Feb 2023 | 423 Lansdale Av | 2 wood doors to match (e); 3 fixed sidelights to match (e) street face; 2 back doors (not street facing) wood to match (e); 3 casement units wood to match (e). 1 sash to match (e) street facing. 1 bathroom sash (not street facing).Details
2 wood doors to match (e); 3 fixed sidelights to match (e) street face; 2 back doors (not street facing) wood to match (e); 3 casement units wood to match (e). 1 sash to match (e) street facing. 1 bathroom sash (not street facing). | $46,000 |
| May 12, 2009 | Completed final sign-off Jul 2009 | 71 Sanchez St | work @ apt# b & d only. repair & replacement of window sashes: replace 5 full window sashes on 3rd floor at rear. replace 2 bottom sashes on 2nd floor at rear. replace 1 window sashes at 3rd floor in internal court yard / light court. replace bathroom window on south light well.Details
work @ apt# b & d only. repair & replacement of window sashes: replace 5 full window sashes on 3rd floor at rear. replace 2 bottom sashes on 2nd floor at rear. replace 1 window sashes at 3rd floor in internal court yard / light court. replace bathroom window on south light well. | $8,000 |