Back to bathroom remodel contractors
Foundations R Us
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Dec 2022
- Last 24 months
- 0 permits filed
37 permits since 2000: 29 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 14 days from filing to permit and 296 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2019 | Completed final sign-off Dec 2019 | 901 Mendell St | development of ground fl. rooms, master and basement bathrooms and kitchen remodelingDetails
development of ground fl. rooms, master and basement bathrooms and kitchen remodeling | $15,000 |
| Apr 11, 2017 | Expired or cancelled expired Feb 2025 | 2473 Francisco St | work @ unit# 2473 only. interior renovation to (e) 2 unit condo. relocate kitchen. addition of half bath. (n) laundry closet. expand (e) bedroom by infilling exterior deck. creating a horizontal addition. ** maher: n/a **Details
work @ unit# 2473 only. interior renovation to (e) 2 unit condo. relocate kitchen. addition of half bath. (n) laundry closet. expand (e) bedroom by infilling exterior deck. creating a horizontal addition. ** maher: n/a ** | $80,000 |
| Jun 29, 2015 | Completed final sign-off Oct 2015 | 1681 Alabama St | replace kitchen cabinetry and flooring. replace furnace and remove fireplace. replace bathroom door and flooring. replace back bedroom window and door.Details
replace kitchen cabinetry and flooring. replace furnace and remove fireplace. replace bathroom door and flooring. replace back bedroom window and door. | $22,000 |
| Dec 13, 2012 | Completed final sign-off Jan 2013 | 2049 15th St | as per violation notice,complaint #201280061 12/3/12. one bathroom work. fix water proofing/paint walls and ceiling, tile at tub surroundingDetails
as per violation notice,complaint #201280061 12/3/12. one bathroom work. fix water proofing/paint walls and ceiling, tile at tub surrounding | $1,500 |
| May 31, 2011 | Completed final sign-off Jun 2012 | 249 Rivoli St | foundation replacement, bath and bedroom renovation at 1st floor, new laundry room, storage, and utility room at gr floor,Details
foundation replacement, bath and bedroom renovation at 1st floor, new laundry room, storage, and utility room at gr floor, | $60,000 |
| Oct 7, 2008 | Completed final sign-off Aug 2009 | 1621 Page St | kitchen, family and dining room remodel to include new electrical work at these area and minor work at (e) bathroom and powder room. removal of wall between kitchen & dining area. addition of french doors & window on rear wall. all work to be done on 2nd floor.Details
kitchen, family and dining room remodel to include new electrical work at these area and minor work at (e) bathroom and powder room. removal of wall between kitchen & dining area. addition of french doors & window on rear wall. all work to be done on 2nd floor. | $70,000 |