Permit GraphShortlistSan Francisco building permits since 2000

Foster Construction

Contractor license
406123
State license record
Based in
San Francisco
On San Francisco permits
Aug 2000 to Dec 2014
Last 24 months
0 permits filed

9 permits since 2000: 7 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 1Stairs 2Kitchen remodel 1Bathroom remodel 2

2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 2 days from filing to permit and 98 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 3, 2008Never finaled
issued Apr 2008, no final
3030 Rivera Stground floor remodel (garage) to include a bathroom, study/family rooms. no exterior expansion, converting (e) undeveloped ground floor space to 212 sq ft of usable space
Details
Permit
200804038762
Status
issued
Filed
Apr 3, 2008
Permit issued
Apr 7, 2008
Declared cost
$20,000
Address
3030 Rivera St

ground floor remodel (garage) to include a bathroom, study/family rooms. no exterior expansion, converting (e) undeveloped ground floor space to 212 sq ft of usable space

Open the permit page

$20,000
Jun 12, 2007Completed
final sign-off Sep 2007
1201 Guerrero Stremove & replace kitchen cabs, replace sliding window with new vinyl window in same opening. new sink, add d/w, disposal, bathroom remodel: replace tub with free standing shower.
Details
Permit
200706123708
Status
complete
Filed
Jun 12, 2007
Permit issued
Jun 12, 2007
Final sign-off
Sep 18, 2007
Declared cost
$20,000
Address
1201 Guerrero St

remove & replace kitchen cabs, replace sliding window with new vinyl window in same opening. new sink, add d/w, disposal, bathroom remodel: replace tub with free standing shower.

Open the permit page

$20,000
Foster Construction, contractor license 406123 | Permit Graph