Back to bathroom remodel contractors
Forum Renovation Co. Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Apr 2024
- Last 24 months
- 0 permits filed
67 permits since 2000: 57 completed, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 15 completed, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2019 | Completed final sign-off Feb 2020 | 425 01st St | reconfigure closet and bathroom of master suite. bathtub removal.Details
reconfigure closet and bathroom of master suite. bathtub removal. | $10,000 |
| Aug 20, 2018 | Completed final sign-off Feb 2019 | 799 La Playa | update master bathroom and guest bathroom(replace old tile wint new tiles) remove tub in master bathroom and replace with shower. install hardwood floor and remove ld carpet in living, dinning, and kitchen. paint walls and ceiling, replace old fixture wiht new he fixture.Details
update master bathroom and guest bathroom(replace old tile wint new tiles) remove tub in master bathroom and replace with shower. install hardwood floor and remove ld carpet in living, dinning, and kitchen. paint walls and ceiling, replace old fixture wiht new he fixture. | $25,000 |
| Apr 14, 2016 | Completed final sign-off Sep 2016 | 1314 Funston Av | remove skylight and extend ceiling/roof to existing roof line. remove bedroom closet to be added to adjacent bath. bath remodel. update existing laundryDetails
remove skylight and extend ceiling/roof to existing roof line. remove bedroom closet to be added to adjacent bath. bath remodel. update existing laundry | $30,000 |
| Feb 24, 2016 | Completed final sign-off Sep 2016 | 3818 18th St | update (e) kitchen & 2 1/2 bathrooms. no walls to be altered or removed.Details
update (e) kitchen & 2 1/2 bathrooms. no walls to be altered or removed. | $50,000 |
| Aug 21, 2015 | Completed final sign-off Dec 2015 | 737 Joost Av | bathroom renovation.Details
bathroom renovation. | $25,000 |
| Apr 21, 2015 | Expired or cancelled expired Mar 2018 | 522 Hayes St | #2: update kitchen & bathroom (electrical & plumbing under separate permit); update/install kitchen cabinets, non -structuralDetails
#2: update kitchen & bathroom (electrical & plumbing under separate permit); update/install kitchen cabinets, non -structural | $18,000 |
| Apr 21, 2015 | Never finaled issued Apr 2015, no final | 562 Hayes St | #1: update kitchen & bathroom (electrical/plumbing update) install kitchen cabinets, non-structural, update existing electrical heaters in living room/bedroom elec & plumbing under separate permit.Details
#1: update kitchen & bathroom (electrical/plumbing update) install kitchen cabinets, non-structural, update existing electrical heaters in living room/bedroom elec & plumbing under separate permit. | $25,000 |
| Jul 8, 2014 | Completed final sign-off Aug 2014 | 554 Hayes St | basic bathroom update in units #2 and #4. update electrical, plumbing, tile work, and painting.Details
basic bathroom update in units #2 and #4. update electrical, plumbing, tile work, and painting. | $18,074 |
| Mar 18, 2014 | Never finaled issued Mar 2014, no final | 542 Linden St | unit #1: update kitchen, update bathroom electrical and plumbing, install new cabinets, non structural, some dry rot work.Details
unit #1: update kitchen, update bathroom electrical and plumbing, install new cabinets, non structural, some dry rot work. | $20,000 |
| Oct 16, 2013 | Completed final sign-off Mar 2014 | 1775 Broadway | bathroom & kitchen remodel to incl replace toilet, bath tub, & shower, kitchen cabinet, counter. install dishwasher, new sink & fixtures. replace light fixture and retile both areas.Details
bathroom & kitchen remodel to incl replace toilet, bath tub, & shower, kitchen cabinet, counter. install dishwasher, new sink & fixtures. replace light fixture and retile both areas. | $27,000 |
| Sep 23, 2013 | Completed final sign-off Jul 2015 | 514 Hayes St | unit #1: update kitchen, update bathroom electrical, plumbing. install new cabinets in the kitchen. non structural. install gas shut off valve. comply with compalint# 200841336 / 201325202Details
unit #1: update kitchen, update bathroom electrical, plumbing. install new cabinets in the kitchen. non structural. install gas shut off valve. comply with compalint# 200841336 / 201325202 | $25,000 |
| Sep 23, 2013 | Completed final sign-off Jun 2015 | 522 Hayes St | unit #3c & unit 15: update kitchen, update bathroom electrical, plumbing. install new cabinets in the kitchen. non structural. gas wall heater. new vent thru lightwell up to roof. comply with compalint# 200733973Details
unit #3c & unit 15: update kitchen, update bathroom electrical, plumbing. install new cabinets in the kitchen. non structural. gas wall heater. new vent thru lightwell up to roof. comply with compalint# 200733973 | $25,000 |
| Jul 8, 2013 | Completed final sign-off May 2015 | 522 Hayes St | apt a: update 1 kitchen, update 1 bathroom, electrical, plumbing, mech. install new cabinets in the kitchen. non structural. new lighting high efficiency , new vent thru lightwell up to roof 4' from pl. (n) bathroom fan connect to (e) duct.Details
apt a: update 1 kitchen, update 1 bathroom, electrical, plumbing, mech. install new cabinets in the kitchen. non structural. new lighting high efficiency , new vent thru lightwell up to roof 4' from pl. (n) bathroom fan connect to (e) duct. | $20,000 |
| Mar 5, 2013 | Completed final sign-off Mar 2014 | 2808 Market St | revision to 2012-12-14-6296. install 2 new doors. remove 1 exterior door & install new exterior window same location. replace (e) stair handrail with full height wall. change 1 full bath to 1 full bath plus half bathDetails
revision to 2012-12-14-6296. install 2 new doors. remove 1 exterior door & install new exterior window same location. replace (e) stair handrail with full height wall. change 1 full bath to 1 full bath plus half bath | $2,000 |
| Dec 14, 2012 | Never finaled issued Dec 2012, no final | 2808 Market St | kitchen & bathroom remodel on 2nd floor. reconfigure lower level for legalizing one (n) bedroom, one (n) bathroom & one (n) living room. remove one garage space for new work in lower level. replace all windows & exterior doors.Details
kitchen & bathroom remodel on 2nd floor. reconfigure lower level for legalizing one (n) bedroom, one (n) bathroom & one (n) living room. remove one garage space for new work in lower level. replace all windows & exterior doors. | $40,000 |
| Mar 1, 2012 | Completed final sign-off Aug 2012 | 601 Van Ness Av | kitchen & bathrooms, new sinks, counters & toilets, shower & bath tub replacement, recessed lighting downstairs & upstairs, audio & media cabling, dimmer & fans in bath will have electrican pull permits & plumber.Details
kitchen & bathrooms, new sinks, counters & toilets, shower & bath tub replacement, recessed lighting downstairs & upstairs, audio & media cabling, dimmer & fans in bath will have electrican pull permits & plumber. | $50,000 |
| Jun 2, 2010 | Completed final sign-off Dec 2010 | 694 30th Av | kitchen, bath remodel in kind.Details
kitchen, bath remodel in kind. | $20,000 |
| Feb 10, 2010 | Completed final sign-off Nov 2010 | 1920 16th Av | rewmodel (e) kitchen and master bath with new finishes plbg fixtures and lighting throughout, misc. existing walls, doors and windows to be modified, removed or replaced. new skylight.Details
rewmodel (e) kitchen and master bath with new finishes plbg fixtures and lighting throughout, misc. existing walls, doors and windows to be modified, removed or replaced. new skylight. | $50,000 |
| Dec 16, 2009 | Never finaled issued Dec 2009, no final | 1270 Grove St | work on unit#301.remodel (e) kitchen & bath, remove hallway closets.Details
work on unit#301.remodel (e) kitchen & bath, remove hallway closets. | $15,000 |
| Mar 18, 2008 | Expired or cancelled expired Nov 2010 | 833 Cole St | remodel kitchens & bathrooms in all units, no structural, provide exhaust fans in bathrooms, terminate exhaust 3f from minimum opening at property line.Details
remodel kitchens & bathrooms in all units, no structural, provide exhaust fans in bathrooms, terminate exhaust 3f from minimum opening at property line. | $100,000 |
| Jul 30, 2007 | Completed final sign-off Oct 2007 | 575 28th St | update (2) existing bathrooms (tile, painting, plumbing fixtures, electrical fixtures, vanity, new lighting on occupant sensor.Details
update (2) existing bathrooms (tile, painting, plumbing fixtures, electrical fixtures, vanity, new lighting on occupant sensor. | $4,000 |