Fortunate Construction Llc
- Based in
- Cupertino
- On San Francisco permits
- Sep 2020 to Sep 2022
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 184 days from filing to permit and 608 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2020 | Completed final sign-off Nov 2022 | 2975 Cesar Chavez St | convert existing uncoditioned gr level into new 2 br/1 ba additional dwelling (adu). interior remodel of e single family residence. expansion of e deck and addition of new dedk on e roof. replacing all doors and windows with new energy compliant windows doors. no work proposed on facade.Details
convert existing uncoditioned gr level into new 2 br/1 ba additional dwelling (adu). interior remodel of e single family residence. expansion of e deck and addition of new dedk on e roof. replacing all doors and windows with new energy compliant windows doors. no work proposed on facade. | $175,000 |