Back to bathroom remodel contractors
Fontana Construction, Inc.
- Based in
- San Rafael
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 13 permits filed
147 permits since 2000: 101 completed, 8 in progress, 23 never finaled, 15 expired or cancelled.
Of the 23 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 33 completed, 1 in progress, 4 never finaled, 3 expired or cancelled. Typically 4 days from filing to permit and 357 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2025 | Completed final sign-off Sep 2026 | 2655 Broderick St | revision to pa#202508294203. remodel of the primary bedroom and bathroom at 3rd floor. replace primary bathroom window sash. new bathroom layout with shower and tub. replace interior wood doors at 3rd fl. remodel of guest bathroom & laundry room at 3rd fl. install new electric subpanel & installDetails
revision to pa#202508294203. remodel of the primary bedroom and bathroom at 3rd floor. replace primary bathroom window sash. new bathroom layout with shower and tub. replace interior wood doors at 3rd fl. remodel of guest bathroom & laundry room at 3rd fl. install new electric subpanel & install | $70,000 |
| Aug 29, 2025 | Expired or cancelled expired Sep 2026 | 2655 Broderick St | remodel of master bathroom at 3rd fl. replace fixtures and finishes. replace hardwood flooring throughout house.Details
remodel of master bathroom at 3rd fl. replace fixtures and finishes. replace hardwood flooring throughout house. | $70,000 |
| Feb 24, 2025 | In progress issued Feb 2025 | 245 Euclid Av | repair waterproofing at 3rd fl shower, replace floor & wall tile. replace wall tile at powder bath below (2nd fl). no exterior workDetails
repair waterproofing at 3rd fl shower, replace floor & wall tile. replace wall tile at powder bath below (2nd fl). no exterior work | $20,000 |
| Nov 14, 2024 | Completed final sign-off Mar 2025 | 2869 Clay St | remodel unit including install (n) powder room remodel 2 (e) bathrooms new led lighting at select locations create (n) closet at office create (n) study room adjacent to mbr install (n) washer/dryer at hallwayDetails
remodel unit including install (n) powder room remodel 2 (e) bathrooms new led lighting at select locations create (n) closet at office create (n) study room adjacent to mbr install (n) washer/dryer at hallway | $130,000 |
| Jan 8, 2024 | Completed final sign-off Dec 2024 | 101 Lombard St | unit# 808: remodel unit including kitchen and 2 bathrooms, fixtures to remain in (e) locations, replace all recessed light fixtures and interior doors, install new lighting at selected locations, install new flooring at selected locations. all (e) required fire ratings shall be maintained.Details
unit# 808: remodel unit including kitchen and 2 bathrooms, fixtures to remain in (e) locations, replace all recessed light fixtures and interior doors, install new lighting at selected locations, install new flooring at selected locations. all (e) required fire ratings shall be maintained. | $250,000 |
| Sep 12, 2022 | Completed final sign-off May 2024 | 25 Presidio Tr | rev to pa# 2022-0318-0362; construction of a ceiling pop-up in master bathDetails
rev to pa# 2022-0318-0362; construction of a ceiling pop-up in master bath | $5,000 |
| Mar 18, 2022 | Completed final sign-off May 2024 | 25 Presidio Tr | rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet.Details
rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet. | $40,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2021 | 33 Alta St | interior renovation of (e) bathroom, new finishes, lighting, door, plumbing fixtures & fittingsDetails
interior renovation of (e) bathroom, new finishes, lighting, door, plumbing fixtures & fittings | $35,000 |
| Aug 22, 2020 | Completed final sign-off Feb 2021 | 1656 Beach St | revision to bpa#201705317985. reduced scope of work, bedroom changes & fire place removal elminated. revised kitchen & bathroom layout - new architect/engineer, new drawings.Details
revision to bpa#201705317985. reduced scope of work, bedroom changes & fire place removal elminated. revised kitchen & bathroom layout - new architect/engineer, new drawings. | |
| Jul 28, 2020 | Completed final sign-off Feb 2023 | 2222 Hyde St | #6: partial replacement of windows, remodel kitchen & bathrooms, provide new flooring, new electrical outlets & install new radiaters.Details
#6: partial replacement of windows, remodel kitchen & bathrooms, provide new flooring, new electrical outlets & install new radiaters. | $100,000 |
| Jul 1, 2020 | Expired or cancelled cancelled Jan 2026 | 2222 Hyde St | unit 6: partial replacement of windows, remodel kitchen, master bath, guest bath, half bath & closets, provide new flring, elect outletes and lighting throughout.Details
unit 6: partial replacement of windows, remodel kitchen, master bath, guest bath, half bath & closets, provide new flring, elect outletes and lighting throughout. | $100,000 |
| Apr 19, 2019 | Completed final sign-off Oct 2020 | 2375 Bay St | interior work only - remodel kitchen, bathrooms and closets. provide (n) outlets and lights in those areasDetails
interior work only - remodel kitchen, bathrooms and closets. provide (n) outlets and lights in those areas | $200,000 |
| Jan 16, 2018 | Completed final sign-off Mar 2019 | 22 Normandie Tr | remodel basement bath. add wheelchair accessible path from sidewalk to entry. relocate interior walls & main staircase. update interior finishes and fixtures including floors,paint, cabinet, appliances, plmbg fixtures & lighting. add rooftop solar panels. modify (e) plmg,hvac/elec to work above.Details
remodel basement bath. add wheelchair accessible path from sidewalk to entry. relocate interior walls & main staircase. update interior finishes and fixtures including floors,paint, cabinet, appliances, plmbg fixtures & lighting. add rooftop solar panels. modify (e) plmg,hvac/elec to work above. | $1,500,000 |
| Aug 11, 2016 | Completed final sign-off Mar 2017 | 1000 Mason St | #503- interior remodel, kitchen, master bath, powder room and closet, new electrical outlets & lighting in remodel area. n/a ordinance #155-13Details
#503- interior remodel, kitchen, master bath, powder room and closet, new electrical outlets & lighting in remodel area. n/a ordinance #155-13 | $100,000 |
| Jul 1, 2016 | Completed final sign-off May 2024 | 25 Presidio Tr | horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level.Details
horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level. | $125,000 |
| Apr 22, 2016 | Completed final sign-off Nov 2016 | 1932 Baker St | remodel two (e) bathrooms @ level 3 & level 4. added lighting & elect outlets to bedroom level 2 guestroom.Details
remodel two (e) bathrooms @ level 3 & level 4. added lighting & elect outlets to bedroom level 2 guestroom. | $80,000 |
| Apr 6, 2016 | Completed final sign-off Jan 2018 | 358 Arguello Bl | proposed 2 story rear yard addition. (158 s.f) maintain 25% rear yard setback. addition is " horizontal addition" new bedroom and (2) bathrooms are proposed.Details
proposed 2 story rear yard addition. (158 s.f) maintain 25% rear yard setback. addition is " horizontal addition" new bedroom and (2) bathrooms are proposed. | $95,000 |
| Oct 2, 2014 | Completed final sign-off Nov 2016 | 910 Clayton St | upper unit - select demolition of the (e) kitchen, powder room, master bath and 2/f hallway powder room; all work within envelop; no structural work, kitchen and bath remodel. to comply with cec2150.0(k)3 & 5Details
upper unit - select demolition of the (e) kitchen, powder room, master bath and 2/f hallway powder room; all work within envelop; no structural work, kitchen and bath remodel. to comply with cec2150.0(k)3 & 5 | $3,000 |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 2200 Pacific Av | #8-d - revision to 2014.08.04.2951: light fixture & heater type change, existing walls in bath & bedroom to remain, existing doorway to kitchen from dining room to remain.Details
#8-d - revision to 2014.08.04.2951: light fixture & heater type change, existing walls in bath & bedroom to remain, existing doorway to kitchen from dining room to remain. | |
| Jul 18, 2014 | Never finaled issued Jul 2014, no final | 2200 Pacific Av | interior renovation including 2x bathroom and 1x kitchen. modification of select interior non-load bearing partitions and new finishes throughout.Details
interior renovation including 2x bathroom and 1x kitchen. modification of select interior non-load bearing partitions and new finishes throughout. | $150,000 |
| Mar 21, 2014 | Completed final sign-off Jun 2014 | 2046 Divisadero St | remodel (e) bathroom at 3rd floor. add new shower & replace fixtures. construct new walk-in closet off of bedroom. new light fixtures & exhaust fan.Details
remodel (e) bathroom at 3rd floor. add new shower & replace fixtures. construct new walk-in closet off of bedroom. new light fixtures & exhaust fan. | $30,000 |
| Jan 23, 2014 | Completed final sign-off Apr 2015 | 2583 Greenwich St | remodel (e) 2 kitchens/2 bathrooms. install new bath @ level 2 & 3, selected wall alterations, replace (e) wood windows w/insulated wood units, match exist. style. 2 new fire-rated windows @ rear, replace 2 furnaces, 2 waterheaters @ garage, upgrade elec/plumb for both units. new 1/2 bath @ garageDetails
remodel (e) 2 kitchens/2 bathrooms. install new bath @ level 2 & 3, selected wall alterations, replace (e) wood windows w/insulated wood units, match exist. style. 2 new fire-rated windows @ rear, replace 2 furnaces, 2 waterheaters @ garage, upgrade elec/plumb for both units. new 1/2 bath @ garage | $250,000 |
| Dec 19, 2013 | Completed final sign-off May 2015 | 2635 Scott St | new stucco at front facade, new windows and guardrails at front facade, bathroom renovation, some new lighting, new glass panel at top of existing lightwell.Details
new stucco at front facade, new windows and guardrails at front facade, bathroom renovation, some new lighting, new glass panel at top of existing lightwell. | $400,000 |
| Dec 4, 2013 | Completed final sign-off Jan 2015 | 70 Buena Vista Tr | remodel 1 kitchn, 1 bath, 1 power room & add 1 bath in (e) space. remove exterior stair to garage & replace with fire escape ladder to grade. add plywood shear wall & concrete footing. replace exterior pipe guardrail at 3rd floor balcony wiht new.Details
remodel 1 kitchn, 1 bath, 1 power room & add 1 bath in (e) space. remove exterior stair to garage & replace with fire escape ladder to grade. add plywood shear wall & concrete footing. replace exterior pipe guardrail at 3rd floor balcony wiht new. | $150,000 |
| Jun 14, 2013 | Completed final sign-off Jun 2014 | 358 Arguello Bl | remodel 2 (e) kitchens & 2 bathrooms. new bathrooms & laundry closet at level 2 & 3. alterations to selected walls at all 3 floor levels. new attic furnace at level 3. replace (e) water heaters with tankless water heaters. new roofing & 3 new skylights at level 3.Details
remodel 2 (e) kitchens & 2 bathrooms. new bathrooms & laundry closet at level 2 & 3. alterations to selected walls at all 3 floor levels. new attic furnace at level 3. replace (e) water heaters with tankless water heaters. new roofing & 3 new skylights at level 3. | $290,000 |
| Feb 26, 2013 | Completed final sign-off Dec 2014 | 1149 Clayton St | rear yard under (e) enclosed 2nd fl living space. remove (e) exterior stair, deck & wood posts. add (n) enclosed stair & hallway. add (n) property line walls under (e) eclosed space. add (n) wood post. add (n) bath at 1st flDetails
rear yard under (e) enclosed 2nd fl living space. remove (e) exterior stair, deck & wood posts. add (n) enclosed stair & hallway. add (n) property line walls under (e) eclosed space. add (n) wood post. add (n) bath at 1st fl | $147,000 |
| Apr 26, 2011 | Completed final sign-off Apr 2012 | 3870 Washington St | remodel kitchen, remove full bath, add powder room, remove and change location of various windows. not visible from street.Details
remodel kitchen, remove full bath, add powder room, remove and change location of various windows. not visible from street. | $215,000 |
| Dec 3, 2010 | Completed final sign-off Sep 2011 | 2515 Broadway | add new bathroom at basement level. revision to 201003269083Details
add new bathroom at basement level. revision to 201003269083 | $10,000 |
| May 28, 2010 | Completed final sign-off Apr 2011 | 2635 Scott St | remove & replace exist water damage&leaking stucco, doors&windows & enclose leaking 3/fl balcony at west rear facade.no chg to footprint.no wk visible fr street.add roof access ladder &balcony at 3/fl north facade.remodel e breakfast rm powder room &1/2 bath at 2/fl & full bath at 3/fl.Details
remove & replace exist water damage&leaking stucco, doors&windows & enclose leaking 3/fl balcony at west rear facade.no chg to footprint.no wk visible fr street.add roof access ladder &balcony at 3/fl north facade.remodel e breakfast rm powder room &1/2 bath at 2/fl & full bath at 3/fl. | $345,000 |
| Jun 4, 2009 | Never finaled issued Jun 2009, no final | 1770 Scott St | revision to 200708109377, arch/strt/mech updates.phases 1 & 4 only. relocate of exterior windows, int. partition wall change at reception/pro shop. employee bath, womens locker rm.str. changes required at exposed (e) condt. including reframing members @ wm locker rm. removal of diagonal beams in nwDetails
revision to 200708109377, arch/strt/mech updates.phases 1 & 4 only. relocate of exterior windows, int. partition wall change at reception/pro shop. employee bath, womens locker rm.str. changes required at exposed (e) condt. including reframing members @ wm locker rm. removal of diagonal beams in nw | |
| Jul 28, 2008 | Expired or cancelled expired Feb 2014 | 2533 Baker St | revision to appl #200502246132 adding rooms including playroom, exercise room, bathroom, wine room, theater room at basement level. (original pt #20000128559 convert two family dwelling to single family dwelling.)Details
revision to appl #200502246132 adding rooms including playroom, exercise room, bathroom, wine room, theater room at basement level. (original pt #20000128559 convert two family dwelling to single family dwelling.) | $70,000 |
| Jul 21, 2008 | Completed final sign-off Mar 2009 | 1230 Sacramento St | new 4 story elevator-vented at top, re-configure bath, storage and algues at each level, new stream unit at (e) shower, new bath fansDetails
new 4 story elevator-vented at top, re-configure bath, storage and algues at each level, new stream unit at (e) shower, new bath fans | $20,000 |
| Oct 10, 2007 | Never finaled issued Oct 2007, no final | 2390 Hyde St | work @ unit# b only. demo (e) floor in a bathroom/remove & replace sub floor. demo (e) shower redo shower pan and re-tile shower & floor. re use (e) fixtures. replace in kind/repair.Details
work @ unit# b only. demo (e) floor in a bathroom/remove & replace sub floor. demo (e) shower redo shower pan and re-tile shower & floor. re use (e) fixtures. replace in kind/repair. | $15,000 |
| Jun 13, 2007 | Completed final sign-off Dec 2007 | 2635 Scott St | master bathroom remodel. new fixtures same locations. tile floor. new door/wndw(same size and location)Details
master bathroom remodel. new fixtures same locations. tile floor. new door/wndw(same size and location) | $90,000 |
| Jul 18, 2006 | Completed final sign-off Aug 2007 | 3939 Washington St | remodel 2 bathroomsa, remove finishes, provide new finishes, lighting & electrical & new plumbing fixtures,one @1/f & one @3/f.remove sink in powder room,add countertop & vessel sink @2/f.remove finishes (tile)in master bath & replace,remove sonces,replace with new sconces @3/fDetails
remodel 2 bathroomsa, remove finishes, provide new finishes, lighting & electrical & new plumbing fixtures,one @1/f & one @3/f.remove sink in powder room,add countertop & vessel sink @2/f.remove finishes (tile)in master bath & replace,remove sonces,replace with new sconces @3/f | $50,000 |
| May 5, 2006 | Completed final sign-off Jun 2007 | 2390 Hyde St | remodel existing kitchen master bathroom laundry bathroom #1 guest bathroom and powder room no exterior workDetails
remodel existing kitchen master bathroom laundry bathroom #1 guest bathroom and powder room no exterior work | $450,000 |
| Aug 2, 2005 | Completed final sign-off Jul 2006 | 2500 Broadway | remodel (e) kitchen, master bathroom,laundry room & add closets in (e) rooms. replace tile on (e)Details
remodel (e) kitchen, master bathroom,laundry room & add closets in (e) rooms. replace tile on (e) | $35,000 |
| Jun 5, 2003 | Completed final sign-off Mar 2004 | 2500 Filbert St | remodel 2 (e) bathrooms on 3rd floor, install pull down attic access stairDetails
remodel 2 (e) bathrooms on 3rd floor, install pull down attic access stair | $50,000 |
| Jun 15, 2001 | Completed final sign-off Jan 2003 | 2856 Union St | bedroom/bath addition in basement with expansion deck.Details
bedroom/bath addition in basement with expansion deck. | $35,000 |
| Aug 23, 2000 | Completed final sign-off Mar 2002 | 126 Divisadero St | kitchen and bathroom remodeling no structuralDetails
kitchen and bathroom remodeling no structural | $50,000 |
| Aug 14, 2000 | Completed final sign-off Nov 2001 | 3748 Divisadero St | kitchen and bathroom remodeling, no structural workDetails
kitchen and bathroom remodeling, no structural work | $50,000 |