Back to bathroom remodel contractors
Fondare Finish Construction Inc.
- Based in
- Santa Rosa
- On San Francisco permits
- Mar 2018 to Jan 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 110 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2021 | Expired or cancelled withdrawn Jan 2022 | 2708 Greenwich St | unit 3: master bath remodel: install (n) door in hallway, close/drywall (e) doorway. remove (e) 6.5" wall and install (n) 4.5 " by 42' wall between shower and tub. (n) drywall from floor up to 5' . (n) marble top vanity. replace (e) tub w/(n) free standing tub. (n) recessed niche 60"h x 15" w/5Details
unit 3: master bath remodel: install (n) door in hallway, close/drywall (e) doorway. remove (e) 6.5" wall and install (n) 4.5 " by 42' wall between shower and tub. (n) drywall from floor up to 5' . (n) marble top vanity. replace (e) tub w/(n) free standing tub. (n) recessed niche 60"h x 15" w/5 | $50,000 |
| Feb 10, 2020 | Completed final sign-off Dec 2020 | 560 Missouri St | exploratoroy demolition of #560b deck (5'x 4') #560b bathroom (5'x4') drywall floor, and tile, #560a master bedroom ceiling and insulation (13'x13') #560b exterior stucco (5'x3') non-street facing, due to water damageDetails
exploratoroy demolition of #560b deck (5'x 4') #560b bathroom (5'x4') drywall floor, and tile, #560a master bedroom ceiling and insulation (13'x13') #560b exterior stucco (5'x3') non-street facing, due to water damage | $7,000 |
| Aug 30, 2019 | Completed final sign-off Sep 2020 | 886 29th Av | convert part of basement to conditioned space add egress window on both ground and first floor. nfew bedroom, denon lower level. new hvac, hot water heater, electrical. relocated existing bathroom on lower level. no change to exterior perimeter. work not visible from street.Details
convert part of basement to conditioned space add egress window on both ground and first floor. nfew bedroom, denon lower level. new hvac, hot water heater, electrical. relocated existing bathroom on lower level. no change to exterior perimeter. work not visible from street. | $40,000 |
| Mar 20, 2018 | Completed final sign-off Apr 2019 | 291 Richland Av | comply with nov 2018-62114. basement: replace furnace with new, ducting and replace water heater. 1st fl - kitchen remodel and new powder room; 2nd fl - update bathroom. replace front door, rear door, deck door, powder room window, deck rails. replace all front windows in-kind,(n) stucco at facade.Details
comply with nov 2018-62114. basement: replace furnace with new, ducting and replace water heater. 1st fl - kitchen remodel and new powder room; 2nd fl - update bathroom. replace front door, rear door, deck door, powder room window, deck rails. replace all front windows in-kind,(n) stucco at facade. | $60,000 |