Back to bathroom remodel contractors
Fma Builders
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 6 permits filed
208 permits since 2000: 121 completed, 15 in progress, 30 never finaled, 42 expired or cancelled.
Of the 30 never-finaled permits, 2 are 3 to 5 years old, 10 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 20 completed, 1 in progress, 4 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2024 | In progress issued Aug 2024 | 3898 Washington St | demo of interior finishes & dry rot repair,5.5 bathrooms remodel in-kind. demo (e)lighting & wiring & replace in-kind.(n)lighting for bathroom remodel comply with cec 150.0(k)5.repair mep systems.no structural work, no (e)wall relocation.(n)sheet rock shall be 5/8" type x.dry rot repair limited to 5Details
demo of interior finishes & dry rot repair,5.5 bathrooms remodel in-kind. demo (e)lighting & wiring & replace in-kind.(n)lighting for bathroom remodel comply with cec 150.0(k)5.repair mep systems.no structural work, no (e)wall relocation.(n)sheet rock shall be 5/8" type x.dry rot repair limited to 5 | $400,000 |
| Nov 22, 2022 | Completed final sign-off Jul 2023 | 100 Locust St | revision to bpa#202106142366. addition of bathroom @ ground floor & room divider for offices.Details
revision to bpa#202106142366. addition of bathroom @ ground floor & room divider for offices. | |
| Jun 14, 2022 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | revision to 202112174639. the revision is to leave the (e) walls at the (e) bathroom in place. this also reduces the requirment for structural work in this area. the kitchenette will be moved to the previous location. no other changes are proposed.Details
revision to 202112174639. the revision is to leave the (e) walls at the (e) bathroom in place. this also reduces the requirment for structural work in this area. the kitchenette will be moved to the previous location. no other changes are proposed. | |
| Dec 17, 2021 | Completed final sign-off Aug 2022 | 3233 Jackson St | interior renovation for one kitchen and two baths. no walls moved, no wall stud framing demo.Details
interior renovation for one kitchen and two baths. no walls moved, no wall stud framing demo. | $30,000 |
| Oct 20, 2021 | Completed final sign-off Dec 2022 | 35 Linda St | unit#37: interior remodel of (e) kithen, pantry, power rm, guest bathroom, guest bedroom, primary bathroom, and exterior bar at g/f rear yardDetails
unit#37: interior remodel of (e) kithen, pantry, power rm, guest bathroom, guest bedroom, primary bathroom, and exterior bar at g/f rear yard | $50,000 |
| Apr 15, 2021 | Completed final sign-off Aug 2021 | 2574 Green St | partial conversion of (e) closet into (n) bathroom.Details
partial conversion of (e) closet into (n) bathroom. | $7,500 |
| Oct 30, 2020 | Never finaled issued Oct 2020, no final | 947 Green St | unit 8 kitchen and bath remodel. new flooring subfloor remains. infill one door between entryance hall and kitchen. egress not affected. per fergal clancyDetails
unit 8 kitchen and bath remodel. new flooring subfloor remains. infill one door between entryance hall and kitchen. egress not affected. per fergal clancy | $25,000 |
| Feb 27, 2018 | Never finaled issued Mar 2018, no final | 3383 Clay St | revision to pa 2015-1214-5080 & 2017-0317-1713 - changing rear deck stairs from westside of property to east; add (n) bathroom chase; change 5 casemtn windows on side to single (fixed); change elec to gas fireplace. replace (e) siding with new matchingDetails
revision to pa 2015-1214-5080 & 2017-0317-1713 - changing rear deck stairs from westside of property to east; add (n) bathroom chase; change 5 casemtn windows on side to single (fixed); change elec to gas fireplace. replace (e) siding with new matching | $20,000 |
| Sep 28, 2017 | Expired or cancelled expired Jun 2024 | 632 El Camino Del Mar | revision to #201511253600 & #201611213218. remove 369 cubic yards of soil to lower storage, bathroom & patio to new level, create new water features. thicken property line fences. north of gridlines l.4 reduce size of new infinity spa/pool. deferred mep. maher ord. no. 155-13Details
revision to #201511253600 & #201611213218. remove 369 cubic yards of soil to lower storage, bathroom & patio to new level, create new water features. thicken property line fences. north of gridlines l.4 reduce size of new infinity spa/pool. deferred mep. maher ord. no. 155-13 | |
| Aug 25, 2016 | Completed final sign-off Jan 2017 | 555 El Camino Del Mar | remove (e) walls, sauna & bathroom. relocate (n)bathroom in (e) wine room; (n) structural sheer wall. all work on 1st floor. no exterior work or expansion of building envelope.Details
remove (e) walls, sauna & bathroom. relocate (n)bathroom in (e) wine room; (n) structural sheer wall. all work on 1st floor. no exterior work or expansion of building envelope. | $50,000 |
| Apr 7, 2016 | Completed final sign-off Jun 2017 | 2845 Lake St | interior remodel of existing basement, new bedroom, full bath, media room. dropping floor to increase ceiling height, new lightwells, infilling under existing grate level patio. replacing floor finish and on 1st fl and bath remodel on 2nd flDetails
interior remodel of existing basement, new bedroom, full bath, media room. dropping floor to increase ceiling height, new lightwells, infilling under existing grate level patio. replacing floor finish and on 1st fl and bath remodel on 2nd fl | $250,000 |
| Jun 23, 2015 | Completed final sign-off Feb 2017 | 1919 Sacramento St | residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers)Details
residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers) | $50,000 |
| Aug 29, 2014 | Completed final sign-off Jun 2018 | 290 Maple St | horizontal extension of 3'-2" at east facade on all stories. infill of east facade lightwell. new elevator. elevator penthouse below (e) ridge. replace interior stairs. interior remodel including kitchen & baths. ** maher: compliance with ordinance no# 155-13 not required **Details
horizontal extension of 3'-2" at east facade on all stories. infill of east facade lightwell. new elevator. elevator penthouse below (e) ridge. replace interior stairs. interior remodel including kitchen & baths. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 |
| Jul 30, 2014 | Completed final sign-off Jan 2015 | 200 Walnut St | due to poor structural conditions in the field under 201405226535 structural remediation required. work includes reinforcement of floor joists at master bath and closet. add new member to ex faming for structural improvement. structural work only. no exterior workDetails
due to poor structural conditions in the field under 201405226535 structural remediation required. work includes reinforcement of floor joists at master bath and closet. add new member to ex faming for structural improvement. structural work only. no exterior work | $22,000 |
| Jul 9, 2014 | Completed final sign-off Aug 2015 | 2586 Clay St | interior renovation at basement and powder room, remodel kitchen and bath. structuraluprgade for future horizontal and vertical expansion under sep permit, pa#201404284370Details
interior renovation at basement and powder room, remodel kitchen and bath. structuraluprgade for future horizontal and vertical expansion under sep permit, pa#201404284370 | $180,000 |
| Jun 2, 2014 | Completed final sign-off Nov 2015 | 3450 21st St | legalize 4th floor as habitable , add bathroom to 4th floor , convert (e) flat roof visible at rear & east facade to accupiable roof deck.n/a maherDetails
legalize 4th floor as habitable , add bathroom to 4th floor , convert (e) flat roof visible at rear & east facade to accupiable roof deck.n/a maher | $25,000 |
| May 22, 2014 | Completed final sign-off Jan 2015 | 200 Walnut St | remodel three (e) bathrooms and one laundry room in kind. no walls to be removed.Details
remodel three (e) bathrooms and one laundry room in kind. no walls to be removed. | $45,000 |
| Jul 10, 2013 | Completed final sign-off Aug 2014 | 3377 Pacific Av | replace (e) cabinets and appliances only in both kitchen and bathroom. install (n) flooring & paint. no new construction.Details
replace (e) cabinets and appliances only in both kitchen and bathroom. install (n) flooring & paint. no new construction. | $20,000 |
| Feb 28, 2013 | Completed final sign-off Nov 2015 | 3450 21st St | (n) habitable space on 1st flr, includes, office, media rm, 1/2 bath, mudroom, laundry rm & wine room w/ wet bar. 2nd fl add 1/2 bath & interior remodel on 2nd, 3rd & 4th fls. seismic upgrade, exterior stucco replaced in kind. three doors replaced in-kind. brick in-fill of three windows at side elevDetails
(n) habitable space on 1st flr, includes, office, media rm, 1/2 bath, mudroom, laundry rm & wine room w/ wet bar. 2nd fl add 1/2 bath & interior remodel on 2nd, 3rd & 4th fls. seismic upgrade, exterior stucco replaced in kind. three doors replaced in-kind. brick in-fill of three windows at side elev | $720,000 |
| Jan 22, 2013 | Completed final sign-off Oct 2015 | 3450 21st St | remodel kitchen aqnd 6 bathrooms. no structural.Details
remodel kitchen aqnd 6 bathrooms. no structural. | $65,000 |
| Mar 28, 2012 | Never finaled issued Mar 2012, no final | 1750 Taylor St | revision to 201202274939: interior remodel of co-op with reconfiguration of kitchen, 2 baths, closet. existing living rm, dining rm, bedroom to remain with minor upgrades of elecrical and lighting throughout.Details
revision to 201202274939: interior remodel of co-op with reconfiguration of kitchen, 2 baths, closet. existing living rm, dining rm, bedroom to remain with minor upgrades of elecrical and lighting throughout. | $172,200 |
| Feb 27, 2012 | Completed final sign-off Sep 2012 | 1750 Taylor St | kitchen and bathroom remodel: 2 bathrooms and 1 kitchen; lighting to comply with cec 150(k)Details
kitchen and bathroom remodel: 2 bathrooms and 1 kitchen; lighting to comply with cec 150(k) | |
| Jul 18, 2011 | Completed final sign-off Feb 2012 | 3725 Jackson St | convert 2 bedrooms into one, relocate bathroom at 2nd floorDetails
convert 2 bedrooms into one, relocate bathroom at 2nd floor | $50,000 |
| Jan 13, 2011 | Completed final sign-off Jul 2011 | 3324 Washington St | remodel one kitchen and one bath.Details
remodel one kitchen and one bath. | $25,000 |
| Dec 2, 2010 | Completed final sign-off Oct 2011 | 176 Palo Alto Av | replace kitchen cabinets and counters "in kind" replace bathroom cabinets & fixtures "in kind" no lighting changes.Details
replace kitchen cabinets and counters "in kind" replace bathroom cabinets & fixtures "in kind" no lighting changes. | $17,000 |
| Aug 12, 2009 | Never finaled issued Aug 2009, no final | 3355 Pacific Av | remove (e) kitchen cabinets and replace with (n) cabinets. remove (e) fixtures/cabinets in bathrooms at 2nd and 3rd floors and replace with (n) fixtures/cabinetsDetails
remove (e) kitchen cabinets and replace with (n) cabinets. remove (e) fixtures/cabinets in bathrooms at 2nd and 3rd floors and replace with (n) fixtures/cabinets | $26,500 |