Back to bathroom remodel contractors
Finesse Construction Llc
- Based in
- Scottsdale
- On San Francisco permits
- Jun 2026 to Aug 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 in progress. Typically 1 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 737 Bush St | unit #404: removal of all plaster in the unit. replacing 500 sqft. of sheetrock. prime, paint. replacing all electrical outlets, switches, change all angle stops. in bathroom, kitchen r&r cabinets, and vanity. toilet replacement, tub will stay in place and will be 5/8 type x everywhereDetails
unit #404: removal of all plaster in the unit. replacing 500 sqft. of sheetrock. prime, paint. replacing all electrical outlets, switches, change all angle stops. in bathroom, kitchen r&r cabinets, and vanity. toilet replacement, tub will stay in place and will be 5/8 type x everywhere | $50,000 |