Back to bathroom remodel contractors
Fierro Construction Inc
- Based in
- Richmond
- On San Francisco permits
- Mar 2019 to Jun 2024
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 18 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2021 | Completed final sign-off Sep 2022 | 78 Prosper St | lower unit: remodel (e) kitchen & bathroom. convert (e) bedroom 2 to suite, bathroom for primary bedroom. convert (e) dining room to bedroom 2, add (n) closet and door. custom millwork throughout.Details
lower unit: remodel (e) kitchen & bathroom. convert (e) bedroom 2 to suite, bathroom for primary bedroom. convert (e) dining room to bedroom 2, add (n) closet and door. custom millwork throughout. | $50,000 |
| Jul 7, 2020 | Completed final sign-off Sep 2020 | 1370 Valencia St | apt #2 : bathroom remodel: replace tiles, tub, vanity, sink top, shower diverter ,faucet fixture and lines if needed at same location in kind. bathroom approx. 11ft x5ft.Details
apt #2 : bathroom remodel: replace tiles, tub, vanity, sink top, shower diverter ,faucet fixture and lines if needed at same location in kind. bathroom approx. 11ft x5ft. | $8,000 |
| Oct 25, 2019 | Completed final sign-off May 2020 | 136 Marietta Dr | master bathroom remodel. expansion of extg master bathroom footprint. new shower, toilet and vanity.Details
master bathroom remodel. expansion of extg master bathroom footprint. new shower, toilet and vanity. | $9,000 |
| Oct 18, 2019 | Completed final sign-off Apr 2021 | 524 03rd Av | conversion of 960 sf of unhabitable space @ 1st fl - 2 bedrms, family rm & bath connected to 2nd fl dwelling unit; replace interior stairs connecting 1st & 2nd fl; 2nd fl kitchen/dining alterations; replace ext rear stairs in-kind, side & rear ext repairs; nfpa13r sprinklers @ 1st fl, new tanklessDetails
conversion of 960 sf of unhabitable space @ 1st fl - 2 bedrms, family rm & bath connected to 2nd fl dwelling unit; replace interior stairs connecting 1st & 2nd fl; 2nd fl kitchen/dining alterations; replace ext rear stairs in-kind, side & rear ext repairs; nfpa13r sprinklers @ 1st fl, new tankless | $325,000 |