Back to bathroom remodel contractors
Fides Construction Inc.
- Based in
- Millbrae
- On San Francisco permits
- Sep 2007 to Aug 2026
- Last 24 months
- 11 permits filed
56 permits since 2000: 35 completed, 3 in progress, 3 never finaled, 15 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 17 completed, 1 in progress, 3 expired or cancelled. Typically 0 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2026 | In progress issued Jun 2026 | 39 Sussex St | add 2 (n) roof dormers on 3rd flr; interior remodel throughout all flrs; relocate kitchen and 2 (e) bathrooms; add a (n) powder room on 2nd flr; add a wet bar on 1st flr; create (n) interior connections between all 3 flrs; build a (n) rear deck on 1st flr.Details
add 2 (n) roof dormers on 3rd flr; interior remodel throughout all flrs; relocate kitchen and 2 (e) bathrooms; add a (n) powder room on 2nd flr; add a wet bar on 1st flr; create (n) interior connections between all 3 flrs; build a (n) rear deck on 1st flr. | $200,000 |
| Feb 3, 2025 | Expired or cancelled expired Aug 2026 | 1828 29th Av | revision to pa 202407226960 add new skylight. relocate two new skylights. modify the location of plumbing fixtures in the bath on 2nd fl. remodel the kitchenDetails
revision to pa 202407226960 add new skylight. relocate two new skylights. modify the location of plumbing fixtures in the bath on 2nd fl. remodel the kitchen | $25,000 |
| Jul 22, 2024 | Completed final sign-off Aug 2026 | 1828 29th Av | 1st fl interior additions - bedroom & bathroom; 2nd fl interior remodel, enclose exterior stairs lightwell & bathroom lightwellDetails
1st fl interior additions - bedroom & bathroom; 2nd fl interior remodel, enclose exterior stairs lightwell & bathroom lightwell | $150,000 |
| Jun 21, 2019 | Expired or cancelled expired Jun 2024 | 4121 19th Av | add 2 bedrooms, 2 bathrooms,office. use 5/8 type "x" drywall on ceiling and walls.Details
add 2 bedrooms, 2 bathrooms,office. use 5/8 type "x" drywall on ceiling and walls. | $60,000 |
| May 15, 2018 | Completed final sign-off Aug 2019 | 110 09th Av | kitchen remodel, half bath relocation on 2nd fl. master bath remodel, 2nd bath relocation on 3rd fl. window rpelacement rear only, replace all lath & plaster w/type "x" drywall on 2nd & 3rd fl. 200 amp electrical upgrade. electrical rewiring.Details
kitchen remodel, half bath relocation on 2nd fl. master bath remodel, 2nd bath relocation on 3rd fl. window rpelacement rear only, replace all lath & plaster w/type "x" drywall on 2nd & 3rd fl. 200 amp electrical upgrade. electrical rewiring. | $200,000 |
| Feb 14, 2017 | Completed final sign-off Sep 2018 | 128 Corona St | remodel existing kitchen, bathroom, laundry, add one full bath & one 1/2 bath, windows replacement at sides & rear building.Details
remodel existing kitchen, bathroom, laundry, add one full bath & one 1/2 bath, windows replacement at sides & rear building. | $110,000 |
| Aug 20, 2012 | Completed final sign-off Jul 2013 | 222 Roosevelt Wy | interior remodel: add one (n) master bathroom, remodel (e) kitchen, bathroom and bedrooms. replace (e) rotted siding around the house. replace (e) lath and plaster with 5/8" type x gyp bd on wall & ceiling window & doors replacement.Details
interior remodel: add one (n) master bathroom, remodel (e) kitchen, bathroom and bedrooms. replace (e) rotted siding around the house. replace (e) lath and plaster with 5/8" type x gyp bd on wall & ceiling window & doors replacement. | $80,000 |
| Jun 24, 2011 | Completed final sign-off Nov 2012 | 2979 Lake St | interior remodel on 2nd floor work includes:rearrange the layout of bedrooms, bathroom and study on 2nd floor. replace extg lath and plaster with gyp bd. for wall and ceiling on 2nd floor.new structural work for rearrangement.Details
interior remodel on 2nd floor work includes:rearrange the layout of bedrooms, bathroom and study on 2nd floor. replace extg lath and plaster with gyp bd. for wall and ceiling on 2nd floor.new structural work for rearrangement. | $100,000 |
| Apr 22, 2011 | Completed final sign-off Nov 2011 | 147 Milton St | complete interior remodel on 1st floor and 2nd floor. add new study and new bathroom on 2nd floor. replace extg lath and plaster with gyp board. new mechanical, plmg and electrical throughout.Details
complete interior remodel on 1st floor and 2nd floor. add new study and new bathroom on 2nd floor. replace extg lath and plaster with gyp board. new mechanical, plmg and electrical throughout. | $46,000 |
| Dec 20, 2010 | Completed final sign-off Feb 2011 | 1181 Girard St | addd new bathroom on 1st floor.remodel extg bathroom on 1st floor.Details
addd new bathroom on 1st floor.remodel extg bathroom on 1st floor. | $14,000 |
| Aug 20, 2010 | Completed final sign-off Nov 2010 | 1727 35th Av | bathroom remodel: replace (e) bathroom fixtures include toilet, sink, tub, shower exhaust fan, vanity, recessed light and window (u-factor = 0.40 max.) replace (e) water heater. replace all supply and waste line pipe for bathroom. water heater replacement in same location - garage.Details
bathroom remodel: replace (e) bathroom fixtures include toilet, sink, tub, shower exhaust fan, vanity, recessed light and window (u-factor = 0.40 max.) replace (e) water heater. replace all supply and waste line pipe for bathroom. water heater replacement in same location - garage. | $6,000 |
| Mar 16, 2010 | Completed final sign-off Apr 2010 | 715 Victoria St | replace (e) window in kind, not view from the street location, master bedroom, 2 on right side, 1 on back wall casement window, guest bathroom, 1 on back wall casement window, bedroom 2 on back wall casement windowDetails
replace (e) window in kind, not view from the street location, master bedroom, 2 on right side, 1 on back wall casement window, guest bathroom, 1 on back wall casement window, bedroom 2 on back wall casement window | $1,800 |
| Feb 11, 2010 | Completed final sign-off Jul 2010 | 106 Bright St | add new bedrooms & bathrooms on 1st & 2nd floors, remodel (e) bathroom on 2nd floor & relocate (e) kitchen on 2nd floorDetails
add new bedrooms & bathrooms on 1st & 2nd floors, remodel (e) bathroom on 2nd floor & relocate (e) kitchen on 2nd floor | $35,000 |
| Feb 11, 2010 | Completed final sign-off May 2010 | 445 Banks St | remodel kitchen & bathroom (interior), enlarge (e) opening between kitchen, dining & breakfast. refinish floors in kitchen, dining room & breakfast. re-paint home interior & exteriorDetails
remodel kitchen & bathroom (interior), enlarge (e) opening between kitchen, dining & breakfast. refinish floors in kitchen, dining room & breakfast. re-paint home interior & exterior | $25,000 |
| Nov 26, 2008 | Expired or cancelled expired Mar 2013 | 319 Gates St | interior remodel, 1st fl: legalize family room, full bath, office, bedroom, replace interior stair to 2nd fl. 2nd fl: remodel bedrooms, bath, living rm, kitchen, convert rear sunroom to dining rm.Details
interior remodel, 1st fl: legalize family room, full bath, office, bedroom, replace interior stair to 2nd fl. 2nd fl: remodel bedrooms, bath, living rm, kitchen, convert rear sunroom to dining rm. | $25,000 |
| Oct 14, 2008 | Completed final sign-off Jun 2009 | 1255 24th Av | replace kitchen cabients and bathroom fixtures in unit #1, #2 & 3. add new bathroom in unit #2; replace (e) single-glazed windows with dual-glazed windows in kind; add one new window in unit #2.Details
replace kitchen cabients and bathroom fixtures in unit #1, #2 & 3. add new bathroom in unit #2; replace (e) single-glazed windows with dual-glazed windows in kind; add one new window in unit #2. | $15,000 |
| Jun 9, 2008 | Completed final sign-off Apr 2010 | 715 Victoria St | horizontal addtion/add new bathroom and closet at new addition/remodel extg bathroom on 1st floor -------conversion to full building permit as of 08/22/08--------Details
horizontal addtion/add new bathroom and closet at new addition/remodel extg bathroom on 1st floor -------conversion to full building permit as of 08/22/08-------- | $60,000 |
| Apr 21, 2008 | Completed final sign-off Feb 2009 | 618 Precita Av | remodel e kitchen. add new bath on the 2nd floor. remodel e bathroom. add insulation and replace e gyp bd at envelope of conditioned space on 2nd floor. new hardwood floor, paint job.Details
remodel e kitchen. add new bath on the 2nd floor. remodel e bathroom. add insulation and replace e gyp bd at envelope of conditioned space on 2nd floor. new hardwood floor, paint job. | $40,000 |
| Jan 17, 2008 | Completed final sign-off Nov 2008 | 23 Starview Wy | interior alteration, exterior windows, remodel (e) kitchen,bath, widen stairs. hallway up stairs, add (n) family room, (n) office, (n) bedroom (n) bathroom, downstairs, add insulation & (n) gyp bd, envelope of conditioned space.Details
interior alteration, exterior windows, remodel (e) kitchen,bath, widen stairs. hallway up stairs, add (n) family room, (n) office, (n) bedroom (n) bathroom, downstairs, add insulation & (n) gyp bd, envelope of conditioned space. | $100,000 |
| Sep 14, 2007 | Completed final sign-off Mar 2008 | 1658 35th Av | remodel existing bathroom. replace vanity, sink, toilet,tub, and shower. replace gyp board, tile and finishes. replace existing skylight. acrylic replace with laminated glassDetails
remodel existing bathroom. replace vanity, sink, toilet,tub, and shower. replace gyp board, tile and finishes. replace existing skylight. acrylic replace with laminated glass | $10,000 |
| Sep 6, 2007 | Completed final sign-off Mar 2008 | 1618 35th Av | relocate kitchen on second floor. relocate two bathrooms. change bedroom to study. add skylights w/in envelope of bldng.. no structural work.Details
relocate kitchen on second floor. relocate two bathrooms. change bedroom to study. add skylights w/in envelope of bldng.. no structural work. | $40,000 |