Back to bathroom remodel contractors
Fertiz Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2021 to May 2026
- Last 24 months
- 8 permits filed
30 permits since 2000: 26 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2023 | In progress issued Sep 2024 | 254 Jules Av | legalize un-permitted horizontal addition on 2 stories, ground flr to include two bedrooms, laundry room, full bathroom & a kitchen. 2nd flr to legalize side deck, rear deck w/ spiral stair, kitchen, dining room & communicating stairs between 2nd & 1st flr.Details
legalize un-permitted horizontal addition on 2 stories, ground flr to include two bedrooms, laundry room, full bathroom & a kitchen. 2nd flr to legalize side deck, rear deck w/ spiral stair, kitchen, dining room & communicating stairs between 2nd & 1st flr. | $53,800 |
| Nov 3, 2021 | Completed final sign-off Oct 2023 | 1286 42nd Av | to legalize on garage level 1 new bedroom, 1 bath, new laundry and new t.v. roomDetails
to legalize on garage level 1 new bedroom, 1 bath, new laundry and new t.v. room | $46,500 |
| Sep 9, 2021 | Never finaled issued Sep 2021, no final | 1286 42nd Av | one bathroom remodel: replace walls, finishes, tile, new shower valves, new electrical. one kitchen remodel: replace cabinets and sink. new electrical led lites, upgrade electrical panel to 200 amps, new electrical upstairs.Details
one bathroom remodel: replace walls, finishes, tile, new shower valves, new electrical. one kitchen remodel: replace cabinets and sink. new electrical led lites, upgrade electrical panel to 200 amps, new electrical upstairs. | $20,000 |
| May 4, 2021 | Completed final sign-off Oct 2021 | 254 Jules Av | bathroom remodel: new shower plumbing fixtures, new electrical vanity, new floor. main eletrical panel upgrade. from 100 amp to 200 amp, new electrical for the bathroom, 3 bedroom and the living room, new electrical radiant heating mats installation for all rooms. replace 2 windows at front, 2 on -Details
bathroom remodel: new shower plumbing fixtures, new electrical vanity, new floor. main eletrical panel upgrade. from 100 amp to 200 amp, new electrical for the bathroom, 3 bedroom and the living room, new electrical radiant heating mats installation for all rooms. replace 2 windows at front, 2 on - | $36,000 |
| Mar 8, 2021 | Completed final sign-off Jun 2021 | 187 Corbett Av | installation of new shower walls tile, new floor tile, replace vanity in toilet. no wall modification for bathroom.Details
installation of new shower walls tile, new floor tile, replace vanity in toilet. no wall modification for bathroom. | $24,900 |