Back to bathroom remodel contractors
Felix G Sanchez (Touch Design And Build
- Based in
- San Francisco
- On San Francisco permits
- Feb 2026 to Sep 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 1 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 1 completed, 4 in progress. Typically 4 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 50 Capra Wy | unit 11: revision to bpa: 202604290361 - add washer / dryer to (e) closet and replace bathroom window like for like. ref bpa: 202604068970Details
unit 11: revision to bpa: 202604290361 - add washer / dryer to (e) closet and replace bathroom window like for like. ref bpa: 202604068970 | $8,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 3740 Fillmore St | interior remodel to e unit 304 that includes new kitchen and bathroom areas. no exterior changes. no changes to unit number. e mech systems to remain. e gas service to remain. bedroom and kitchen relocated.Details
interior remodel to e unit 304 that includes new kitchen and bathroom areas. no exterior changes. no changes to unit number. e mech systems to remain. e gas service to remain. bedroom and kitchen relocated. | $90,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 50 Capra Wy | unit #4: bathroom and kitchen remodel in kind. electrical sub-panel upgrade.Details
unit #4: bathroom and kitchen remodel in kind. electrical sub-panel upgrade. | $40,000 |
| Apr 6, 2026 | Completed final sign-off Sep 2026 | 50 Capra Wy | unit 11: like for like bathroom remodel & kitchen remodel, subpanel upgrade, new tiles, shower valve, toilet, new cabinets and counter tops. no layout change, no wall stud framing demolitionDetails
unit 11: like for like bathroom remodel & kitchen remodel, subpanel upgrade, new tiles, shower valve, toilet, new cabinets and counter tops. no layout change, no wall stud framing demolition | $40,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 3322 Buchanan St | units #302 & 306: bathroom remodel (4)- remove and replace bath fixtures in two bathrooms. remove and replace bath, shower and tile. remove and replace kitchen cabinets (2 kitchens).Details
units #302 & 306: bathroom remodel (4)- remove and replace bath fixtures in two bathrooms. remove and replace bath, shower and tile. remove and replace kitchen cabinets (2 kitchens). | $10,000 |